My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02462
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:03 PM
Creation date
10/11/2006 11:07:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/9/1981
Author
PSIAC
Title
Minutes of the 81-2 Meeting - September 9-10 1981
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00'3Z4? <br /> <br />Lower Colorado River RC&D Area <br /> <br />Area plan is scheduled for completion in November <br />1981. <br /> <br />The Cibola Farm Irrigation Canal Lining measure <br />plan has been approved by the State Conservationist <br />and construction will begin in the summer of 1981. <br /> <br />Planning is underway on the Aha-Quin Public Water- <br />based Recreation measure. <br /> <br />CALI FORN I A : <br /> <br />High Sierra RC&D <br /> <br />Construction of the Placerville Airport Critical <br />Area treatment project has been completed.. Con- <br />. struction is nearing completion on the Georgetown <br />PUD critical area treatment project. Plans and <br />specifications are being prepared for the Bear <br />River critical area treatment project. We expect <br />to award a contract for $15,000 for the initial <br />erosion control work in September 1982. <br /> <br />North Cal-Neva RC&D <br /> <br />. The second contract for Susan River critical area <br />treatment project was awarded in March 1982 at a <br />cost of $72,000. Work is not expected to get <br />underway until late summer. <br /> <br />Central Coast RC&D <br /> <br />The N.F. Lewis Creek critical area treatment <br />project will be constructed by the County of <br />Monterey at a cost of $20,000. The County of <br />Santa Cruz is in the process of securing local <br />matching funds for the second consturction <br />contract of the Pinto Lake Recreation project. <br />Current plans are to award a $500,000 contract <br />for basin recreation facilities and wildlife <br />enhancement measures. <br /> <br />COLORADO: <br /> <br />Colorado Big County RC&D Area <br /> <br />Hayden F. P. Measure - This measure. was com- <br />pleted July 8, 1981. <br /> <br />Two Rivers Park Rec. Measure - Final designs are <br />being prepared. Construction on the first phase <br />is expected to begin early in 1982. <br /> <br />-11- <br /> <br />.~, , > <br /> <br />"", -", <br />
The URL can be used to link to this page
Your browser does not support the video tag.