My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02462
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:03 PM
Creation date
10/11/2006 11:07:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/9/1981
Author
PSIAC
Title
Minutes of the 81-2 Meeting - September 9-10 1981
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003229 <br /> <br />Memo to Executive Subcommittee, PSIAC <br />Page 3 <br />September 15, 1981 <br /> <br />Special Report - San Juan - Chama Project <br /> <br />Mr. Bill Miller of the New Mexico Interstate Stream Commission gave <br />a report on the San Juan-Chama project, a USBR water development project <br />which diverts water from tributaries in the headwaters of the San Juan <br />River in Colorado and delivers them to the Chama River (Rio Grande <br />System) in northern New Mexico. The project was constructed .in the late <br />1960's, and involves about 102,000 acre-feet. A most interesting aspect <br />of the project is the precise record keeping required to insure that the <br />imported water can be distinguished from the water of the Rio Grande <br />system when determining Compact entitlements. <br /> <br />List of Publications <br /> <br />The draft list of PSIAC publications was discussed, and it was <br />decided to give PSIAC members until October 9 to request additions or <br />corrections. After that date, the Utah Division of Water Resources will <br />finalize the list and distribute copies. <br /> <br />Election of Chairman <br /> <br />The Executive Subcommittee agreed to defer the election of a new <br />chairman until a decision is reached concerning the future of PSIAC. <br />(Barry Saunders, whose term as Chairman expires September 30, will be <br />unable to continue serving as Chairman in the interim.) <br /> <br />The Subcommittee recommended that PSIAC contact the Department of <br />Interior and request a policy decision from them concerning interagency <br />committees such as PSIAC. (Under the present PSIAC charter, PSIAC ia " <br />. . a regional instrumentality under the aegis of the Water Resources <br />Council.") <br /> <br />B-9 <br /> <br />..li._ _.' <br />-ie" ,_"'; :!..~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.