Laserfiche WebLink
<br />development within the permit area, For example, all action alternatives include <br />programs for summer recreational 'uses and nordic skiing. <br /> <br />The off-site development scenario was provided by TOSV and analyzed in each <br />alternative as connected and/or cumulative actions. This scenario describes the <br />level of development of the of the East Village area at the base of Burnt <br />Mountain, as well as development elsewhere within TOSV, <br /> <br />TableS-2 provides a comparison of MDP components by alternative. <br /> <br />1. COMMON ELEMENTS <br /> <br />A number of MDP elements are common to all action alternatives and are described <br />below to avoid duplication in the description of alternatives, <br /> <br />a. Lifts <br /> <br />Removal of the Naked Lady, Alpine Springs; and Sam's Knob fixed-grip lifts and <br />installation of new Alpine Springs and Sam's Knob detachable quad lifts were <br />actions authorized by the Forest Supervisor since the release of the DEIS <br />(6/22/93 Decision Notice and Finding of No Significant Impact), The ski area's <br />permitted capacity of 10,000 skiers-at-one.time (SAOT) was not affected by these <br />actions. <br /> <br />Five of the existing 16 lifts would remain unchanged, both in capacity and in <br />alignments, in all alternatives, These include: <br /> <br />. Sam's Knob detachable quad; <br />. Big Burn detachable quad; <br />,. Alpine Springs detachable quad; <br />. Fanny Hill detachable quad; and <br />. Coney Glade detachable quad. <br /> <br />Skiing would be limited to the daytime in all alternatives, <br />been proposed in Alternative F in the DEIS,) <br /> <br />(Night skiing had <br /> <br />b. Clearing <br /> <br />The majority of direct effects to watershed, wildlife, and visual resources are <br />related, to treatments for the development of new and expanded ski trails and the <br />construction of other ski-related facilities. Three types of treatment are <br />assessed in the EIS -- full clearing, partial clearing, and full grading, <br /> <br />Both full clearing and full grading would remove all standing vegetation. Full <br />grading involves excavation and earth-moving to remove stumps and grade/contour <br />ski trails. With partial clearing, up to SO percent of the existing vegetation <br />would be removed and ground-disturbing activities would be minimal, Remaining <br />vegetation could take the form of untreated "leave islands" (forest patches) <br />and/or scattered trees within treated areas. The only soil disturbance may be <br />due to the skidding of trees to remove them from the site, As long as effective <br />ground cover is maintained, no discernible increases in soil loss would be <br />expected. <br /> <br />c. Snowmaking <br /> <br />Snowmaking operations would be expanded in all action alternatives to facilitate <br />a longer ski season, provide more consistent snow cover and surface conditions, <br />and to enhance recreational opportunities and utilization of the ski area. As <br />snow conditions are more reliable at the upper portion of the mountain during <br /> <br />Summary . 6 <br />