|
<br />j;'
<br />,"f.;
<br />
<br />'. '--"~"'~' -."~,
<br />
<br />"
<br />"
<br />"
<br />,
<br />11
<br />
<br />38
<br />
<br /><::>
<br />"'-I
<br />00
<br />
<br />STREAMFLOW
<br />
<br />J
<br />,
<br />
<br />
<br />,
<br />
<br />.)
<br />
<br />GaIlsteo Creek below Gallsteo Dam, N. Mex.
<br />
<br />C~)
<br />c.;;';LocaHon,-Water-stage recorder, lat 35'27'56-, long 106'12'57", in SE1/4SEI/4 sec. 5, T.14 N., R. 7 E., 0,6 mile downstream from
<br />Calisteo Dam, and 5.5 miles northwest of CerrilJos. Altitude of gage is 5,450 ft.
<br />Draina2e area.-597 sq mi.
<br />Avera2e dischare-e.-26 years (1971-%), 6.16 ft3 /s (4,460 acre-ft per year).
<br />Extremes.-1970.96: Maximum discharge, 2,000 ft'/s July 27, 1971 (gage height, 7,00 ft); maximum gage height, 7.33 ft July 20, 1971; no
<br />flow many days each year.
<br />Remarks.-Records poor. Row partly regulated by uncontrolled outlet in Calisteo Dam. Capadty of outlet, 5,000 ft3 /s when reservoir
<br />is full. Diversions for Irrigation of about.50 acres above reservoir.
<br />
<br />Monthly and yearly discharge, in cubic feet per second
<br />
<br /> Second, Maximum Minimum Runoff in
<br />Month foot.days daily daily Mean acre-feet
<br />January 0,00 0.00 0.00 0.000 0,00
<br />February ,06 .06 .00 ,002 .10
<br />March .00 .00 .00 .000 ,00
<br />April .00 .00 .00 .000 .00
<br />May ,00 .00 ,00 ,000 ,00
<br />June 1.0]5,00 343 .00 33,8 2,010
<br />July 854,75 225 .00 27,6 1,700
<br />August 1,326.35 321 .00 42,8 2.630
<br />September 81.05 36 .00 2.70 161
<br />October 59.23 29 .00 1.91 ]]7
<br />November 29.06 1,6 .51 .97 58
<br />December 72,23 6.9 ,00 2,33 143
<br />Calendar year 1996 3,437.73 343 .00 9,39 6,820
<br />
<br />Jemez River below Jemez Canyon Dam, N, Mex.
<br />
<br />location.-.Water_stage recorder, tat 35023'24", long 106032'03", in NEl/4 sec. 5. T.)3 N., R. 4 E., 0.8 mile downstream from Jemez
<br />Canyon Dam, 2.0 mHes upstream from mouth, and 6 miles north of Bernalillo. Datum of gage is 5,095,60 ft above mean sea level,
<br />datum of 1929. Prior to April 24,1951, at site three"!uarlers ofa mile upstream at datum 24,51 ft higher. April 24, 195/ to June 25, 1958,
<br />at site 37 ft upstream at datum 4.40 ft higher.
<br />Draina2e area.-I,038 sq ml.
<br />Avera2e dischari!e.-54 years (1937,1944-96), 63.5 ftJ /s (46,010 acre--ft per year).
<br />Extremes.~-1937, 1944-96: Maximum discharge, 16,30() ft3 /s Aug. 29,1943 (gage height, 5.62 ft); no flow at times.
<br />Remarks.-Records good. Aow regulated by Jemez Canyon Dam since October 1953. Diversions for irrigation of about 3,000 acres
<br />above station.
<br />
<br /> Monthly and yearly discharge, in cubic feet per second
<br /> Second- Maximum Minimum Runoff in
<br />Month foot-days daily dally Mean acre.(eet
<br />January 647,6 53 1.9 20.9 1,280
<br />February 992.1 54 3,9 34,2 1,970
<br />March 674,7 67 2.0 21.8 ],340
<br />April 28.75 1.7 .64 .96 57
<br />May 22,22 .88 .64 ,72 44
<br />June 34,60 1.7 .64 l.l5 69
<br />July 554,8 2]5 1.9 17.9 ],100
<br />August 729.9 207 5.9 23,5 1,450
<br />September 274.2 17 5,2 9.14 544
<br />October 348.9 81 2.1 11.3 692
<br />November 66.6 2.4 2.1 2.22 132
<br />December 44,41 2.] ,83 1.43 88
<br />Calendar year 1996 4.418.78 2]5 .64 12,1 8,760
<br />
<br />
<br />:;~i.1?;
<br />
<br />
<br />
<br />
<br />., ~o
<br />
<br />
<br />
<br />'. .'.~
<br />~~f~
<br />
|