Laserfiche WebLink
<br />h '..'_,;.,< <br /> <br />"";";~"" <br /> <br />:;:^t:'- <br />.:':~~ <br /> <br />, ' <br />~~-;.. <br />~'ff: <br />0' <br /><; :;'1<) <br />''J t"'" <br />;i~ \..: <br />'J C) <br /> <br />, <br /> <br />! <br /> <br />RULES AND REGULATIONS <br />RESERVOIR CAPACITIES L1 <br /> <br />Colorado shall file with the Commission a table of areas and capacities for each <br />reservoir in the Rio Grande Basin above Lobatos constructed after 1937; New Mexico shall <br />file with the Commission a table of areas and capacities for each reservoir in the Rio Grande <br />Basin between Lobatos and San Marcial constructed after 1929; and Texas shall file with the <br />Commission tables of areas and capacities for Elephant Bulte Reservoir and for all other <br />reservoirs actually available for the storage of water between Elephant Bulte and the first <br />diversion to lands under the Rio Grande Project. <br /> <br />Whenever it shall appear that any table of areas and capacities is in error by more <br />than five per cent, the Commission shall use its best efforts to have a re-survey made and a <br />corrected table of areas and capacities to be substituted as soon as practicable. To the end <br />that the Elephant Bulte effeetive supply may be computed accurately, the Commission shall <br />use its best efforts to have the rate of aceumulation and the place of deposition of silt in Ele- <br />phant Butte Reservoir checked at least every three years. <br /> <br />'-j <br /> <br />ACTUAL SPiLL 12. <br /> <br />(a) Water released from Elephant Bulte in excess of Project requirements, which <br />is currently passed through Caballo Reservoir, prior to the time of spill, shall be deemed to <br />have been Usable Water released in anticipation of spill, or Credit Water if such release <br />shall have been authorized, <br /> <br />(b) Excess releases from Elephant Bulte Reservoir, as defined in (a) above, shall <br />be added to the quantity of water actually in storage in that reservoir, and Actual Spill shall <br />be deemed to have commeneed when this sum equals the total physical eapacity of that res- <br />ervoir, to the level of the uneontrolled spillway, i.e. -2,219,000 acre-ft in 1942, <br /> <br />(c) All water actually spilled at Elephant Butte Reservoir, or released therefrom, in <br />excess of Project requirements, which is currently passed through Caballo Reservoir, after <br />the time of spill, shall be considered as Actual Spill, provided that the total quantity of water <br />then in storage in Elephant Bulte Reservoir exceeds the physical capacity of that reservoir <br />at the level of the sill of the spillway gates, i.e. -1,830,000 acre-ft in 1942, <br /> <br />(d) Water released from Caballo Reservoir in excess of Project requirements and <br />in excess of water currently released from Elephant Bulte Reservoir, shall be deemed <br />Usable Water released, excepting only flood water entering Caballo Reservoir from tributar- <br />ies below Elephant Bulte Reservoir, <br /> <br />DEPARTURES FROM NORMAL RELEASES Q. <br /> <br />For the purpose of computing the time of Hypothetical Spill required by Article VI <br />and for the purpose of the adjustment set forth in Article VII, no allowance shall be made for <br />the difference between Actual and Hypothetieal Evaporation, and any under-release of <br />usable water from Project Storage in excess of 150,000 acre-ft in any year shall be taken as <br />equal to that amount. <br /> <br />L1 Amended at Eleventh Annual Meeting, February 23, 1950. <br /> <br />12. Adopted at Fourth Annual Meeting, February 24, 1943. <br /> <br />, Q. Adopted June 2, 1959; made effective January 1, 1952, <br /> <br />.<,; ,c::..[~;':~t~i~' <br /> <br />16 ii,"'#""K"",., I <br />