Laserfiche WebLink
<br />1 15 <br />I TA8LE 1 <br /> ACTUAL LOADS ANO RESOURCES FOR THE YEAR 1981 <br /> WSCC REG ION <br />I. PEAK DEMAND - MW JAN FE8 MAR APR MAY JUN <br /> Loads - Finn 75142 77343 72575 75122 72808 82563 <br />I Interruptible 1259 1279 1186 1161 1290 1286 <br /> Total 76401 78622 73761 76283 74098 83849 <br /> Forecast Deviation . Percent -8.6 -2.3 -6.1 2.3 -5.7 -0.5 <br />I Generation-Hydro 53715 53114 52438 51513 53403 54748 <br /> Thennal 62908 62945 62801 63059 62887 63242 <br /> Other ---.lID. --..llli. 1338 ----1.lli. --!.ill. --.!.ill. <br />I Total 117968 117397 116577 115890 117616 11930S <br />Total Unavailable Generation * 18578 21959 22616 22743 24323 16777 <br /> Net Finn Transfers - MEXICO ** -34 -33 0 -32 0 0 <br />I Net Generation & Finm Transfers 99424 95471 93961 93179 93293 I02528 <br /> Margin Over Firm Loads - MW 24282 18128 21386 18057 2048S 19965 <br />1 Margin Over Firm Loads - Percent 32.3 23.4 29.5 24.0 28.1 24.2 <br />ENERGY - GWH <br /> Total Load 43329 39345 41398 40161 40687 43289 <br />I Forecast Deviation - Percent -7.4 -4.1 -5.5 -1.8 -3.1 0.5 <br />I <br />I, PEAK OEr1AflO - MW JUL AUG SEP OCT NOV OEC <br />Loads - Finn 81249 82778 79328 73007 74268 767S2 <br /> Interruptible 1294 1188 1258 1069 1006 1135 <br />I Total 82543 83966 80586 74076 75274 77887 <br /> Forecast Deviation - Percent -2.9 -1.3 -3.1 -5.9 -7.5 -8.3 <br />I Generation-Hydro 54546 54524 54416 S4374 5S060 55161 <br /> Thenna 1 63604 63531 63480 63510 63712 64624 <br /> Other --1ill. -.llil 1332 -1lli. 1345 t232 <br /> Total 119385 119368 119228 119198 120117 12I017 <br />I Total Unavailable Generation * 1S379 15415 19448 21037 19431 13564 <br />Net Finn Transfers - MEXICO 24 30 0 0 0 0 <br />I Net Generation & Firm Transfers 103982 103923 99780 98161 100686 107453 <br />Margin Over Firm loads -MW 22733 21145 20452 25154 26418 30701 <br /> Margin Over Finm Loads ~ Percent 28.0 25.5 25.8 34.5 35.6 40.0 <br />I ENERGY - GWH TOTAL <br />Total Load 45387 45353 41851 41246 40600 44161 506807 <br />I Forecast Deviation - Percent 0.7 0.4 0.4 -2.5 -6.1 -5.5 -2.9 <br /> . Includes Maintenance. Forced Outages, and Inoperable Capability. <br />I .. Minus (-) indicates transfer into WSCC. <br />I <br />