Laserfiche WebLink
<br />revlslng its criteria for reporting the hydro capability of the federal <br />system from a one hour to a ten hour sustained peaking capability <br />beginning in 1979. The new criteria reduces the area's hydro capability <br />by approximately 1,500 MW. In addition, Grand Coulee's capability has <br />been reduced by 1,543 MW through the summer of 1983 due to a tailwater <br />problem. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />t <br />I <br />I <br />I <br />J <br />1 <br />I <br /> <br />12 <br />