My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02396
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:33 PM
Creation date
10/11/2006 11:05:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Western Slope
Date
1/1/1978
Author
Myron B Holburt
Title
Annual Report for the Calendar Year 1977
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... . <br />llJJ::' <br /> <br />re...earch and development for fi...cal <br />year 1978. <br />The Secretary of thf> Interior <br />rt'Qu~ted an environmental ...tudy for <br />po...sible allernati\ie sitt..., for the <br />Intermoun(d;n Power Project that will <br />have les... impach on air quality at the <br />Capitol Reef National Park and the <br />Canyonlands National Park. The...e <br />ahernative ...ite... \....ould be from 50 to <br />70 mile... northt'r1y of the pr~ently <br />propo...ed ...itt' near the Capitol Rt'ef <br />National Park. <br />The Bureau 01 Reclamdtion <br />awarded a $12.7 million contract for <br />the con...truction of T~'zack Dam, d <br />principdl ft'ature of the /en.~en Unit of <br />tht' Centrill Utdh Project. The t'arthfill <br />ddm will store water for domestic, <br />indu...trial dnd irrigation use... In and <br />around Vernal, Utah. <br />The Bureau of Rfflamdtion <br />awardNl a $4.2 million contract for <br />power intakt' structure modification... <br />on the flilmlng Corgf' Ddm. Sinct' the <br />reservoir wa... filll:'d in the late 1960'..., <br />the water released through the dam's <br />powerplant has bt't'n too cold for <br />ideal trout production and ...urvival. By <br />modifying the powl'rplant intakes on <br />the upstream sidE' of the ddm ...0 that <br />water can be wlthdrdwn from a le\lt" <br />nearer the warmer surface, water <br />temperatures can be raised by 10 to <br />15 deRrees, which is e).pt>cted to <br />restore river trout fishing. <br />The Bureau of Reclamation <br />awarded a $5.5 million contract to <br />lurnish and lay about ]J mile... of 6- <br />through 72.inch-diameter pipe, lateral <br />drains, and control dpvice... for the <br />,,\'JViljo Indiiln Imj!dtion Project. <br />Completion of this work will make <br />available an irrigation diStribution <br />system for appro\imatelv 8,800 acres. <br />Also, the Bureau awarded a $6 million <br />contrdcl for the construction of 11.4 <br />miles of the Amarillo Canal that will <br />feed water from the Gravih \1ain <br />Canal to a 10,000 acrt' portion of the <br />Navaio Indian Irri~ation Projl'Ct. <br />The Bureau of Rfflamation <br />awarded a $27.8 million contract for <br />the construction of the 8-mile-long <br />Stillwater T unnt"l-a ~('V feature 01 the <br />8onne~'tI!e Unit of th{' Central Utah <br />Project. The tunn{'1 is p,ut of the <br />]7-mil{' Strawbern Aqut>duct, a <br />system of rest'f\oirs and dl\ersion <br />facilities to collect \\aler irom high <br />mountain Slreilm~ and transport it to <br />the enlarRro Stril\\berf\ Re~ervolr for <br /> <br />transfer of water for domestic and <br />industrial uses in Salt Lakt' County, <br />and for supplemental irrig.'ltion wdtt'r <br />for farms in Utah and Juab Counties <br />and other counties in the central pan <br />of the State. <br />The 8ureau of Rffldmation <br />awarded d $12.] million contrJ.Ct for <br />the construction of a 10.7 milt' <br />undNground condUit and diversion <br />sys!pm .....hich will supply part of tht' <br />water for generating hydroelfftricitv <br />dt the ML Eiben Pumped Stordge <br />Powerpldnt near Leadvillt', Colorado. <br />The conduit is a part of a com pIe). <br />system of collpction tunnels and <br />regulating reservoirs of the <br />ftvin/?pdn.Ark,Jn.Y5 Project. which <br />diverts water from the we...t slope of <br />the Continentdl Dividf' to the <br />Arkansas River Basin on the edst sidt' <br />01 the mountain range. \Vhen <br />comple!ed, the Ml. Elbert <br />pump-generator fdCility will supply <br />200 m~awatts of peaking pow!;"r to <br />customt"rs in Colorado. <br />The Bureau of Rl:'Clamdtion on June <br />1, 1977, increased the rdte charged to <br />customers for commNcidl <br />hydroplfftric po.....er from the <br />Color.lda Ri~er Stora/w Project bv <br />about 7 percent. The ratt:'S were <br />increased in order to mPt"t opt'rating <br />costs and rt'pclyment of capital <br />investment within the payout periods <br />pf{'scribed by Rt"Clamation Law. The <br />ne\'.' wholt'Sale firm demand charge <br />was rai...ed to $1.H kw/mo, and the <br />ent'rgy charge was raist'd to ],4 <br />mills/kw-hr. <br /> <br />loner 8i1_in Del'f'!opmpn/\ <br /> <br />The Board.... staff rt'viev..ed tht' linal <br />EIS on the St'Cond S!agt' of the <br />Sourhern '\('~'dd.l 11'dff'r Projecf. Tht' <br />Burl"au of Rfflamation awarded a <br />$].1 million contract, the first lor the <br />second stage of tht' project, for thp <br />furni...hing and laving of 1.] miles of <br />90.. and 102-inch diameter pipeline, <br />for the Projfft'<, ...f'("ond .,tage \1ain <br />Aqueduct "B" line, about 19 milt's <br />pa...t of Las Vegas. porallel to the <br />t'xlstm~ fir...t std!W \lain Aqueduct "A" <br />line. Besld~ tht' "B" line, the St'Cond <br />stagt' \..iill comi.,t of five new pumping <br />plants. modifiCdtion to iour t'xistmg <br />first stage pumping plants dnd 30 <br />miles of ne\.. aqul'<iuct and pipelinps. <br />Further te...timom on the water <br /> <br />~ <br /> <br />supply for the 5und~ert /\'ucleJr <br />Project was presented by tht' Chief <br />Engint't'r in July before the State <br />Energy Resources Conservation and <br />Oewlopment Commission. ThE' <br />statement WdS an el>.pansion of the <br />dlrfft tt'stlmony prest'nted to the <br />Commission in Of'Cember 1976. and <br />was in rt....ponse to tht' Commission".. <br />prehearing conference order <br />rt>questing ddditional information on <br />the adt'Quacv 01 the water supply in <br />the t'vent of future droughts and on <br />the "\Vinters Doctrine." <br />The Energy Commission issued the <br />Final Report on the San Die-go Ga.. <br />and EIt:'Ctric Company's "Notice or <br />Intention 10 Sppk Certification for the <br />Sundesert Nuclear Projfft", in <br />Novf:'mbt'r 1977. Hearings were held <br />in Df'Cember on the Final Report, and <br />a dffision was iSSUM on December <br />21, 1977, which madl:' certification of <br />the prOJPCt doubtful. unless the <br />legislature sJX'cifically passe<. a bill <br />exemptin~ the proiect irom tht' <br />nuclear fut'1 c\ide <,tatutes. <br />The Burf'au of Reclamation <br />dwarded a $12.9 million (:ontract for <br />th{' construction of Reach 6, a 15.2 <br />mile section of tht' Granite Rt'ef <br />Aqueduct. a principal feature of the <br />Ct'ntra! Arizona ProJ("(-t. With this <br />contr.lct, the t'leventh major one on <br />the Project a.....arded ..inn' 1973, a <br />total of 71 mile,>, or ]7 percent, of the <br />190-mile.long Crilnite Reel Aqueduct <br />will be undt'r comtruction. Th{' <br />Colorado River BOilrd pas"f'(j cl <br />resolution supporting the re..toration <br />of funds for the 1977-78 fiscal war, <br />which fund... had bf't'n recommended <br />for deletion by the Federal <br />Admini..tration. <br />The Burpau of Rfflamiltion rell'd..ed <br />a rt'port titlt>d '"Srdlu.~ <br />Report-C(>()fhermdl Resource_ <br />Ime~tl/?dtion E.N .\le5d Te!of Site." The <br />report indicales that FtE'Othermal <br />dt>5altmg is IPChnically feasiblp and <br />about 75 percent of the W.ltef of the <br />geothermill fluid can be removed <br />u..in~ geotht'rm.ll t'neq~v <IS J heat <br />source ior distillation. Sufiicient pO\H'r <br />can bt' gpnf;.rated irom a portion of <br />the geothermal rluid to meet the <br />plant's energv neros. The Reotht'rmal <br />re<.t'rvoir at East \-15a is estlmatt'<1 to <br />ha\e a Ide in t'xcess of ]0 \'ears with <br />minimum change in reservoir fluid <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.