My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02384
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:30 PM
Creation date
10/11/2006 11:05:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.200.40
Description
Colorado River Basin Salinity Control Work Group
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1993
Title
Colorado River Basin Salinity Control Project - Grand Valley Unit
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Con8lrucIion <br /> <br />Lower Gunnison Basin Unit ............................................................................................................;...................... <br /> <br /> <br />,. <br /> <br />o <br />N StlItua of NEPA <br />,U\ compliance <br />-.J <br /> <br />Final Environmental Impact Statement filed with Environmental Protec:tion Agency <br />February 1 0, 1984. . <br /> <br />Other InformlItIon <br /> <br />The Intent of Congress is to remove salt from the Colorado River by the most <br />ltI;Qnomical means. Increments of authorized units mayor may not be <br />constructed depending upon the amount of salt needed to. be removed as <br />Indicated in The Joint Evaluation Report of Interior and Agriculture. <br /> <br />Appropriation ceiling <br /> <br />Appropriations authorized are $301,483,000 (October 1993) forTrtle II of the <br />Colorado River Basin Salinity Control Project under Public Law 93-320. The . <br />comparable Federal obligation Is $721,839,196 which exceeds the appropriation <br />ceiling by more than the amount of contingencies included in the obligation. <br />Appropriate congressional committees will be advised of the appropriation <br />ceiling status for this project. Legislation to provide additional appropriation <br />ceiling will be needed to complete the total project as authorized. Current <br />estimated commitments will be held within the existing ceiling. The cost of the . <br />features of McElmo Creek Unit which is a part of the Dolores Participating Projecl:t, <br />CRSP, Is included in the total Federal obligations and the appropriation ceiling for <br />TItle /I facilities. <br /> <br />Work proposed <br />for FY 1994 <br /> <br />DIstribution System . PreconstJUc:tion worle leading to eward of a construc:tion <br />agreement will continue on East Side Latarallmprovements. $ 100,000 <br /> <br />Worle will continue on the Menoken System Improvements and be completed on <br />the Chlpeta System Improvements. $2,505,0011 <br /> <br />On-Fann System. Worle will be completed on the Uncompahgre Valley Water <br />User Association, Chipeta, and Menoken service areas on-fann improvements. <br />$1.588.000 <br /> <br />Total request <br /> <br />$4,193,0011 <br /> <br /> <br />190 <br /> <br />\,;,'_<_'.0' <br /> <br />~ -.>- <br />
The URL can be used to link to this page
Your browser does not support the video tag.