Laserfiche WebLink
<br />RECEIVED <br /> <br />FEB 5 1988 <br /> <br />,..,~, <br /> <br />1:'11. ~t~ "'iIIIIDlIIl'CIl <br />.:... flowr""""l1m8111.~.Q1Ut)' <br /> <br />~ <br />~ <br />...;( <br /> <br />PHASE I FEASIBILITY STUDY FOR <br />UPPER GUNNISON-UNCOMPAHGRE BASIN <br /> <br />TASK MEMORANDUM NO. ;/7" <br /> <br />U,mop/ 4ec:lw~ <br /> <br />Submitted to: <br /> <br />Colorado Water Resources and Power Development Authority <br />15BO Logan Street, Suite 620 <br />Denver, Colorado 80203 <br /> <br />Prepared by: <br /> <br />HDR Engineering, Inc. <br />303 East 17th Avenue, Suite 300, <br />Denver, Colorado 80203 <br /> <br />In association with: <br /> <br />WBLA, Inc. <br />Woodward Clyde Consultants <br />U.S. Bureau of Reclamation <br />C.U. Center for Economic Analysis <br /> <br />February 1988 <br />