My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02293
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:00 PM
Creation date
10/11/2006 11:01:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
1/1/1961
Title
Water Supply for the Proposed Yellow Jacket Project on the White River in Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C) <br />~ <br />~ <br />CJ <br /> <br />confirmed for the South Fork; and it is assumed that the same mini- <br /> <br />mum flow will be applicable to the North Fork as well. <br /> <br />For study purposes demands on the river have been estab- <br /> <br />Ii shed in the following order of priority: <br /> <br />First - Existing decrees (the measure of this demand is <br /> <br />assumed to be the sum of Miller Creek, Highland, <br /> <br />Oak Ridge Park and Old Agency ditches). <br /> <br />Second - Fish flows (30 c.f.s. each fork). <br /> <br />Third - piceance Creek Pipeline (70 c.f.s. in irrigation <br /> <br />t~ season; 35 c.f.s. balance of year) . <br /> <br />Fourth - Rocky Mountain Power Company (all water available <br /> <br />at MeadeWB Reservoir site). <br /> <br />Fifth - Yellow Jacket Project. <br /> <br />Existing decrees are a demand first on the North Fork, next <br /> <br />on South Fork inflow below Meadows, and third on South Fork inflow <br /> <br />above Meadows. <br /> <br />: <br />j, <br />( <br />, <br /> <br />Fish flows are a demand on each fork, after existing decrees <br /> <br />; <br />t <br />. <br /> <br />are satisfied. <br /> <br />piceance Creek Pipeline conditional decree will be satis- <br /> <br />i <br />l <br />. <br />i <br /> <br />fied first from South Fork inflow below Meadows, next from South <br /> <br />~: <br /> <br />Fork inflow above Meadows, when necessary. <br /> <br />Rocky Mountain Power Company requirements will be satisfied <br /> <br />with South Fork inflow above Meadows. <br /> <br />Yellow Jacket Project requirements will be satisfied from <br /> <br />the aggregate of the North Fork and South Fork flows, at the Buford <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.