Laserfiche WebLink
<br />ACTIVITIES <br /> <br />PRODUCTS <br /> <br />Central Case Volumetric Projections and Water <br />Supply Estimates <br />(February 1974-0ctober 1974) <br /> <br />Activity One: Estimation of currenl (1975) <br />volumetric supplies (February <br />1974-0ctober 1974) <br /> <br />Activity Two: Projection of volumetric re- <br />quirements (February 1974- <br />October 1974) <br /> <br />Activity Three: Synthesis of other planning <br />study information-literature <br />review (February 1974-0ctober <br />19741 <br /> <br />Central Case Volumetric Adequacy Analysis <br />(November 1974-February 1975) <br /> <br />Activity One: VOlumetric adequacy analysis on <br />central case (November 1974- <br />December 1974) <br /> <br />Activity Two: Comparison of other planning <br />studies with central-case results <br />(December 1974) <br /> <br />Activity Three. Compilation of central case volu- <br />metric information lor regional <br />sponsors (January 1975-Febru- <br />ary 1975) <br /> <br />Central Case Non-Volumetric Analysis <br />(February 1974-May 1975) <br /> <br />Activity One: Projection of central-case non- <br />volumetric re.(lUlrements (Febru. <br />ary 1974-January 19751 <br /> <br />Activity Two: Compilation of central case non- <br />volumetric prOjectIOns for re- <br />gional sponsors (February 1975) <br /> <br />ActiVity Three: Nonvolumetric analysis on cen- <br />tral case (November 1974-May <br />19751 <br /> <br />Analysis of. Variations from the Central Case <br />(November 1974.May 1975) <br /> <br />ActiVity One: Projection of variations from <br />central case conditions (Novem- <br />ber 1974-March 1975) <br /> <br />ActiVity Two: Volumetric adequacy analysis on <br />variations (April 1975) <br /> <br />ActiVity Three: Impact analYSIS on variations <br />(May 1975) <br /> <br />Estimates of current (19751 volumetric water <br />supplies <br />Volumetric water use projections for 1975, 1985, <br />and 2000 <br /> <br />i PHASE <br />I <br />I <br />I <br />I <br />i <br /> <br />I Identification of Statelregional volumetric projec- <br />I tions and the assumptions on which they were <br />based from framework studies. the 1968 National <br />Assessment and other major studies <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />, <br />t PHASE II <br /> <br />, <br /> <br />Comparisons of 1985 and 2000 water use with cur- <br />rent (1975) supplies central case conditions to deter- <br />mine: <br /> <br />, . <br />. <br /> <br />(1) relative deficiencies <br /> <br />(2) the effect of increased consumptive use on in- <br />stream flow levels at the exit point to each <br />ASA. <br /> <br />i Comparison of volumetric projections contained in <br />'I completed Statelregional studies with those of the <br />1975 Assessment <br />, <br />I <br />I <br />I <br /> <br />I Nonvolumetric projections for 1975, 1985, and <br />2000 <br /> <br />Identification and description of the effects of <br />! central case conditions on national economic <br />j development, regional development, environ- <br />I mental quality and social well-being <br />I <br />i PHASE 1111 Identification and description of the location and <br />I I nature of specific nonvolumetnc problems which <br />! ! are expected to arise in each ASA <br /> <br />II Identification and description of the important <br />water and related land resources which should be <br />I preserved in their natural state because of their <br />i scenic, recreational, or cultural values <br /> <br />Projections for 1985 and 2000 of seven major <br />vanations from central case conditions <br /> <br />I Determination of the effect of these variations on <br />I relative volumetric deficiencies and instream flow <br />1 PHASE lvi levels at the eXit point of each ASA <br /> <br />i I Identification and description of the impact that <br />, I these variations would have on national economic <br />I development, regional development. environmental <br />quality and social well-being. <br /> <br />) <br /> <br />1 <br /> <br />Nationwide Analysis Wrap-Up (June 1975) i Identification from among the central case and <br />Activity One: Nationwide appraisal of previous ! I variations of a set of .future prOjections (modified <br />phases (June 1975) ; I central case) for use 10 subsequent analYSIS <br />: PHASE V <br />ActiVity Two: Compilation of nationwide analy- ! II Compilation of nationWide analysis information In <br />sis results (June 1975) i a format suitable for inclusion in the 1975 Assess- <br />ment Report. <br /> <br /> <br />Figure 5. Summary of nationwide analysis activities and products. <br /> <br />14 <br />