My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02223
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:24 PM
Creation date
10/11/2006 10:59:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/21/1997
Title
Agenda Item 20 Animas-La Plata Project
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C"':I <br />N <br />N <br /> <br />c <br /> <br />The Tribal claims encompassed the potential irrigation of some <br />93,000 acres, in over 25 stream systems. Most of these lands were <br />in the La Plata and Mancos River Basins, which were water-short and <br />over-appropriated, Success by the Tribes would totally eliminate <br />existing non-Indian irrigation, disrupting local economies and <br />creating hostility, <br /> <br />The 1986 Settlement Agreement <br />and Subsequent Legislation <br /> <br />In April 1985, many parties, public and private, convened <br />negotiations to address the issues raised by the Tribe's reserved <br />rights claims. The state of Colorado's negotiating position was <br />based on several principles: <br /> <br />vested property rights held by owners of state decreed <br />water rights would not be compromised; <br /> <br />existing economies should be protected; <br /> <br />existing uses should be protected by a "no injury" <br />standard; <br /> <br />reserved rights claims should be quantified by state <br />water court, not by Congress or in federal courts; and <br /> <br />the Tribes I legitimate needs, such as the lack of a <br />potable water supply for Towaoc, should be met. <br /> <br />After intense and complex negotiations, an agreement in principle <br />was reached that included a binding cost-sharing agreement for <br />construction of the Animas-La Plata Project. This Agreement was <br />titled the "Agreement in Principle Concerning the Colorado Ute <br />Indian Water Rights Settlement and Binding Agreement for Animas-La <br />Plata Project Cost Sharing." By signing the Agreement in <br />Principle, the Secretary of Interior certified that the non-federal <br />cost share contributions were reasonable, allowing for the federal <br />release of the first $1 million for construction of the Project. <br />In addition to the cost sharing elements of the Agreement, the <br />parties to the state water court litigation agreed to a set of <br />principles that established the parameters for settlement of the <br />reserved right claims, <br /> <br />i." <br /> <br />~ ,: <br /> <br />Reservation, and the Bureau of Indian Affairs, Subsequently, the application was <br />amended and eleven separate applications were filed, each amended application <br />asserting water rights associated with a specific river: W-1603-76 (Navajo <br />River); W-1603-76A (Blanco River); W-1603-76B (San Juan River); W-1603-76C <br />(Piedra River); W-1603-76D (Pine River); W-1603-76E (Florida River); W-1603-76F <br />'j (Animas River); W-1603-76G (Mancos River) ; W-1603-76H (Dolores River) ; W-1603-76I <br />/ (McElmo Creek); and W-1603-76J (La Plata River). <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.