My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02192
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:06 PM
Creation date
10/11/2006 10:57:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.J
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1981
Author
USDOI - WPRS
Title
CRSP Power Peaking Capacity - Dunham Point Unit - Colorado - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />WATER AND POWER RESOURCES SERVICE <br />UPPER COLORADO REGION <br />NOTICE OF INITIATION OF INVESTIGATION <br /> <br />Name of Investigation: CRSP Power Peaking Capacity, Dunham Point Unit, <br />Colorado <br /> <br />Location of Investigation: Two miles northeast of McPhee Dam on the Dolores <br />River in Southwestern Colorado, ten miles northwest of Dolores, Colorado <br /> <br />Date Investigations Initiated: Feasibility investigations were authorized <br />by P.L. 89-561, dated September 7, 1966. Scheduled date of completion <br />of the feasibility report and draft environmental statement is September <br />1984. <br /> <br />1. Scope of Investigations: The studies will investigate the possibility <br />of a pumped storage hydroelectric facility being constructed at the prQ- <br />posed McPhee Reservoir for the purpose of providing up to 1,500 MW of <br />peaking power. The investigation is being conducted to determine the <br />engineering and economic feasibility and associated environmental and <br />social impacts of the Dunham Point Unit. The study will address prob- <br />lems and needs, evaluate resources available, evaluate alternative <br />plans, select a plan, conduct specific evaluations of the plan, address <br />environmental impacts, and produce the appropriate reports. <br /> <br />2. Problems and Needs: The Colorado River Storage Project service area is <br />expected to need additional hydroelectric power to help meet peak e1ec- <br />rica1 demands. <br /> <br />3. Prospective Solutions: Construct the proposed Dunham Point Unit pumped <br />storage hydroelectric facility with a combined unit capacity of up to <br />1,500 MW. The facility would utilize the proposed McPhee Reservoir as <br />an afterbay and would require construction of a higher elevation forebay <br />reservoir on Dunham Point. <br /> <br />4. Participation: The investigation will be done in accordance with the <br />principles and standards for multiple-objective water resources plan- <br />ning. Interested persons, organizations, and agencies are requested to <br />forward, within 30 days, an expression of interest in the investigations, <br />to inform us of pertinent data that can be made available for our use, <br />to furnish comments and suggestions as may be considered appropriate, and <br />to express possible interest in participating on the planning team. In <br />most cases expenses incurred during participation on the planning team <br />would not be reimbursib1e. Expressions of interest should be sent to <br />the Regional Director, P.O. Box 11568, Salt Lake City, Utah 84147 or to <br />the Projects Manager, Durango Projects Office, P.O. Box 640, Durango, <br />Colorado 81301. <br /> <br />Prepared: <br /> <br />February 4, 1981 <br /> <br />Transmitted: February 4, 1981 <br /> <br /> <br />?Wt: <br />~/ ~ <br />. Regional Director <br /> <br />~J M -/f(~ <br />Regional Planning Of icer <br />
The URL can be used to link to this page
Your browser does not support the video tag.