My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02192
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:06 PM
Creation date
10/11/2006 10:57:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.J
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1981
Author
USDOI - WPRS
Title
CRSP Power Peaking Capacity - Dunham Point Unit - Colorado - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The members of the plannin~ team would include the team 1eader. a <br /> <br />representative from each of the involved branches and divisi ons in the <br /> <br />Duran!';o office. and some people from outside tne Durango office. Team <br /> <br />members from outside tne Durango office mi~ht include representatives of <br /> <br />the Regional Office, tne Cortez Construction Office of Water and Power, <br /> <br />r:olorado Division of Wildli fe, and organizations or i.Tv:1ividuals from tl,~ <br /> <br />local project area. The decision on which of these people mi!';ht he on the <br /> <br />planning team will depend on thei~ inte,..p.~t. <br /> <br />It <br /> <br />is anti.cipated <br /> <br />representatives from t'le U.S. Fisn and Wildlife Service and Western Area <br /> <br />Power Admini stration win he memhers of the planning team. <br /> <br />Planning team meetings woul.d !';enerally be neld at the Duran!';o office <br /> <br />in Durango. Colorado. wi tn other meetings 'le1d when and where needed. <br /> <br />Meetings would prol,ably be l1eld every ..ix or seven weelcs on tl1e average. <br /> <br />Participants on t"rle planni_ng team would not be Te~mbur8ed fOT costs. <br /> <br />except tl"e U.S. Fis"" and Wi.ldlife Service whic1l is tl1e only ~overnmental <br /> <br />agency funded hv t1-te Water and Power Resources Service to part{c;pate in <br /> <br />the study. <br /> <br />Sul,teams <br /> <br />Presently two subteams are being considered for the Dunham Point <br /> <br />study; tl,ey are power marketin~ and transmission, and environmental. <br /> <br />InitiaUy. there does not appear to l,e a need for additiona1 suhteams; <br /> <br />however. otl1er suhteams can he formed later as needed. <br /> <br />The power suhteam wou1d be involved witl1 marketing and transmission of <br /> <br />potential Dunnam Point powe... <br /> <br />Specific issues would include defi~in!'; a <br /> <br />market area, identifyi.ng sonrces of Dumptng eneTgy, and coo"'dinating t"te <br /> <br />Dunham Point study with the Western Area Power Administration's study on <br /> <br />the transmission faci..J.i.ties needed to market eRSP power. Western <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.