My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02192
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:06 PM
Creation date
10/11/2006 10:57:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.J
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1981
Author
USDOI - WPRS
Title
CRSP Power Peaking Capacity - Dunham Point Unit - Colorado - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER III <br />STUDY ORGANIZATION <br /> <br />Lead Agency <br /> <br />Water and Power is the lead agency for conducting the study: <br /> <br />therefore, it win be responsible for administe1:"ing the funds allotted to <br /> <br />the study and for schedu1 ing the various activi.ties necessarv to conduct <br /> <br />the study. The Commissioner has delegated responsibility for performance <br /> <br />of the study to the Upper Colorado Regional Director, who in tu~n has <br /> <br />delegated it to the Projects Manager of the Durango office. The Projects <br /> <br />Manager has further delegated the specifics of conducting the study to th" <br /> <br />vari.ous divisions witnin the Durango office; for instance. t"e environmen- <br /> <br />tal division wi.ll be responsible for the environmental. aspects of the <br /> <br />studv. <br /> <br />A study team leader is appoi.nted to organize and coordinate all <br /> <br />aspects of the <br />schedu 1 i ng and <br /> <br />study. His ro1.es include: responsible to management for <br /> <br />funding, assure an effective team process with completion <br /> <br />of functj ons prescribed by team~ assures input ; s received f,..om all <br /> <br />membe~s, and facilitates completion of team objectives. <br /> <br />An objective of the study organization is to reach a consensus among <br /> <br />the teams and various interests groups on decisions; "owever. as lead <br /> <br />agency. Water and Power has the final responsibility for the studv. <br /> <br />Planning Team <br /> <br />The planning team would be an interdiscipli.na1:"Y group formed to <br /> <br />oversee the p1:"ogress and content of the study. This team would coordinate <br /> <br />activities of tltP. subteams~ synthesize information and recommendati~ons <br /> <br />from the various involved di.sciplines (including suhteams). comment on <br /> <br />input from the general public. make specific <br /> <br />recommend on the content of the planning reDort. <br /> <br />recommendations. and <br /> <br />1.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.