My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02161
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:56 PM
Creation date
10/11/2006 10:56:54 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.600.60
Description
Colorado River Basin Salinity Control Program - Basin Member State Info - Utah
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1968
Title
Utah Desalting Study
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF TABLES <br /> <br />~ <br />00 <br />l'\.) <br />~ <br /> <br />No. <br /> <br />T:l,tle <br /> <br />Page <br /> <br />3-l <br /> <br />SUMMARY OF POWER AND PROCESS SrEAM COSTS <br /> <br />8 <br /> <br />3-~ SUMMARY OF DESALTED WATER COSTS AT PLANT BOUNDARY <br /> <br />7.l PRESENT WATER USES AND PRELIMINARY PROJECTIONS OF 20 <br />WArER NEEDS IN UTAH <br /> <br />7-2 PROJECTED WATER USES OF THE WASATCH FRONT 24 <br /> <br />7-2(a) CHEMICAL ANALYSES OF SURFACE WATER ENTERING THE 34 <br />GREAT SALT LAKE <br /> <br />7-3 SUMMARY OF MEAN MONTHLY WATER QUALITY OF PRIMARY 37 <br />TRIBU~IES TO GREAT SALT LAKE <br /> <br />7-4 PRIMARY CHEMICAL CONSTITUENTS OF WArER FLOWING OUT 39 <br />OF THE B~ RIVER MIGRATORY WILDLIFE REFUGE <br /> <br />7-5 PRIMARY CHEMICAL CONSTITUENTS OF WEBER RIVER WATER 42 <br />fLOWING OUT OF OGDEN BAY BIRD REFUGE <br /> <br />7-6 PRIMARY CHEMICAL CONSTITUENTS OF JORDAN RIVER WATER 43 <br />FLOWING OUT OF THE FARMINGTON BAY BIRD REFUGE <br /> <br />7-7 FUTURE; QUANTITY ANP QUALITY OF OUTFLOW WATERS TO 45 <br />GREA T SALT LAKE <br /> <br />8-l ~ISTING, UNDER CONSTRUCTION, AND PROJECTED POWER PLANTS 5l <br /> <br />8-2 UTAH POWER & LIGHT COMPANY INTERCONNECTED SYSTEM POWER 53 <br />AND ENERGY SOURCES NET CAPACITY AND RESERVE FOR AVERAGE <br />WATER YEAR CONDITIONS <br /> <br />8-3 STATE 0)<' UTAH POWER & ENERGY REQUIREMENTS TOTAL 55 <br />INTERCONNECTED SYSTEM <br /> <br />8.4 SALES OF ELECTRIC ENERGY BY UPL OPERATING DIVISIONS 56 <br /> <br /> <br />8.5 POWER CONSUMPTION IN UPL UTAH SERVICE AREA 57 <br /> <br />S-6 LOAD GROWTH PER CAPITA 58 <br /> <br />8-7 J;'REDj:CTED RESIDENTIAL CONSUMPTION 58 <br /> <br />~-8 FUEL COSTS FOR GENERATION OF ELECTRIC ENERGY BASED ON 65 <br />QUANTITIES BURNED IN 1966 ADJUSTED FOR CURRENT FUEL <br />COSTS, VTAH POWER & LIGHT COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.