Laserfiche WebLink
<br />I-" <br />00 <br />l'\:) <br />~.. <br /> <br />No. <br /> <br />9-4 <br /> <br />9-5 <br /> <br />9-6 <br /> <br />9-7 <br /> <br />9-8 <br /> <br />9-9 <br /> <br />9-10 <br /> <br />9-11 <br /> <br />9-12 <br /> <br />9-13 <br /> <br />9-14 <br /> <br />9-15 <br /> <br />9-16 <br /> <br />9-17 <br /> <br />LIST OF FIGURES <br /> <br /> <br />Title <br /> <br />Page <br /> <br />MULTIPURPOSE NUCLEAR POWER PLANT, LITTLE MOUNTAIN SITE <br /> <br />104 <br /> <br />FOSSIL FIRED POWER PLANT SERVING 1000 MWe GRID AND <br />100 l-lJD ED PLANT <br /> <br />106 <br /> <br />ENERGY COST FROM 500 MWe NUCLEAR FUELED PLANT AT <br />LITTLE MOUNTAIN <br /> <br />114 <br /> <br />ENERGY COST FROM 500 MWe FOSSIL FUEL PLANT AT LITTLE <br />MOUNTAIN <br /> <br />116 <br /> <br />ENERGY COST FROM 1000 MWe NUCLEAR FUELED PLANT AT <br />LITTLE MOUNTAIN <br /> <br />118 <br /> <br />ENERGY COST FROM 1000 Mlye FOSSIL FUEL PLANT AT LITTLE <br />MOUNTAIN <br /> <br />120 <br /> <br />COST OF WATER VS. ENERGY COST FOR MSF PLANTS OF THREE <br />SIZES <br /> <br />125 <br /> <br />COST OF BLENDED WATER VS. COST OF MSF DESALTING PLANT <br />WATER USED FOR BLENDING WITH SALINE WATERS OF THREE <br />SALINITY LEVELS <br /> <br />127 <br /> <br />COST OF WATER FROM VTE PLANTS AS A FUNCTION OF ENERGY <br />COST FOR TWO SIZES OF WATER PLANTS <br /> <br />128 <br /> <br />COST OF WATER AS A FUNCTION OF SIZE FROM MSF AND VTE <br />PLANTS FOR FOUR COSTS OF EXHAUST STEAM <br /> <br />129 <br /> <br />COST OF WATER VS. POWER COST FOR 50 MGD ED PLANTS AT <br />THREE FEEDWATER SALINITY LEVELS <br /> <br />130 <br /> <br />COST OF WATER VS. SIZE FOR ED PLANTS RELATIVE TO THE <br />50 MGD PLANTS OF 1968 FOR THREE FEEDWATER SALINITIES <br /> <br />132 <br /> <br />COST OF WATER VS. FEEDWATER TEMPERATURE FOR <br />50 MGD ED PLANT <br /> <br />134 <br /> <br />LOCATIONS FOR DESALTING AND CONVEYANCE FACILITIES <br />CONSIDERED IN THE STUDY <br /> <br />143 <br />