Laserfiche WebLink
<br />SUMMARY <br /> <br />The plan provides for extending the existing rural domestic water <br />systems by installing approximately 16l miles of new pipeline, 858 meter <br />assemblies, and 9 storage tanks. <br /> <br />To provide water deliveries to the point of historic use, distribu- <br />tion features will be installed downstream of the meter installations on <br />private property. These on-farm features would consist of approximstely <br />212 miles of small diameter pipeline and 2,061 stock tanks. No additional <br />water treatment features will be required because the stockwater demands <br />would be made on the system during off-peak months. <br /> <br />Estimated costs <br /> <br />The total conatruction cost for the winter water replacement program <br />is estimated at $27,636,000, based on January 1986 prices. Construction <br />costs are summarized in Table .S-l. <br /> <br />Table S-l <br />Project construction cos~1 <br />Description <br />Modifications to the domestic systems <br />Tri-County syste~1 <br />Menoken system <br />Chipeta system <br />Subtotal <br /> <br />On-farm systems <br />Tri-County system 7,000,000 <br />Menoken system 2,000,000 <br />Chipeta system 2,800,000 <br />Subtotal 11,ROO,OOO <br /> <br />Total 27,636,000 <br />11 January 1986 prices; contains 20 percent con- <br />tingencies and 35 percent other project costs. <br />21 Tri-County costs include $236,000 of minor <br />modifIcations to the Project 7 Water Authority. Costs <br />associated with the other five domestic water supply <br />entities are covered in other project costs. <br /> <br />Cost <br /> <br />$7,636,000 <br />4,200,000 <br />4,000,000 <br />15,836,000 <br /> <br />Development program <br /> <br />A total of 3 years would be needed to develop final construction <br />specifications and to construct the winter water replacement features. <br />Cooperative agreements will be executed with each of the participating <br />domestic water supply entities to prepare specifications and construct <br />the off-farm features. Preparation of specifications and construction <br />of the on-farm features would be accomplished under contract with the <br />UVWUA. <br /> <br />001703 <br /> <br />S-3 <br />