My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02152
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:54 PM
Creation date
10/11/2006 10:56:49 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.E
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1982
Author
USDOI - BOR
Title
Planning Report on the West Divide Project - Colorado - May 1982
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><::> <br /> <br />..-"A) <br /> <br />1:'- <br />C'J <br /> <br />Chapter IV <br /> <br />Chapter V <br /> <br />Chapter VI <br /> <br />CONTENTS (Continued) <br /> <br />Designs and Estimates (continued) <br />Project features (continued) <br />Pumping plants . . . . . . . <br />Divide Creek Pumping Plant. <br />Dry Hollow Pumping Plant. <br />West Divide Pumping Plant <br />Canals and conduits. <br />Dry Hollow Feeder Canal <br />Cache Creek Canal <br />Hunter Mesa Canal <br />West Divide Canal <br />Laterals . . <br />Drains . .. .. . <br />Transmission lines and switchyards <br />Permanent operating facilities <br />Recreational facilities. . <br />Fish and wildlife measures . . <br />Cultural resources program . . <br />Stackyard and orchard fencing. <br />Land for project features . <br />Protection of project works from flood <br />hazards .. .. .. .. .. . ." .. .. .. .. .. <br />Sources of construction materials <br />Estimated costs . . . . . . . . . <br />Construction costs . . . . . . <br />Annual operation, maintenance, and r~place- <br />ment costs . . . <br />Construction schedule <br />Water supply . . . . . <br />Water requirements. <br />Available supply. . <br />Water quality <br />Project water rights. <br />Water use . . . . . . <br />Project operations <br />Project water supply summary <br />Project effects on the Colorado River <br />Irrigation . . . <br />Project lands <br />Topography and soils <br />Drainage . <br />Land classification. <br />Selection of irrigable area. <br />Agricultural Economy. . . <br />Present farming. . . . . . <br />Anticipated development. . <br />Land class equivalents and excess lands. <br />Development period <br />Irrigation repayment. . . <br />Payment capacity <br />Project pressure charge. <br />Account charge . . . . . <br /> <br />ii <br /> <br />Page <br /> <br />29 <br />29 <br />29 <br />30 <br />30 <br />30 <br />30 <br />31 <br />31 <br />32 <br />32 <br />32 <br />34 <br />34 <br />34 <br />34 <br />35 <br />35 <br /> <br />35 <br />35 <br />37 <br />37 <br /> <br />37 <br />42 <br />46 <br />46 <br />47 <br />48 <br />48 <br />49 <br />49 <br />53 <br />53 <br />57 <br />57 <br />57 <br />62 <br />62 <br />63 <br />63 <br />63 <br />63 <br />65 <br />66 <br />66 <br />66 <br />67 <br />69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.