Laserfiche WebLink
<br />o <br />r.'::") <br />.... <br />a":J <br />(J1 <br />00 <br /> <br />Equipment required: <br /> <br />1. Base and boom for measuring streamf1o~ from bridge <br />streamflow equipment. <br /> <br />2. Conductiv~ty meter <br /> <br />3. D-49 sediment sampler <br /> <br />4. About 8 dozen bottles <br /> <br />5. 1 bottle carrier <br /> <br />6. Flashlights <br /> <br />GROUP II <br /> <br />Team <br /> <br />Location and duties <br /> <br />Date <br /> <br />Grozier <br />Gibbs <br /> <br />3-31-76 <br /> <br />Travel to Lamar. Measure Arkansas River above <br />Bent County Canal. <br /> <br />4-1-76 <br /> <br />Measure Arkansas River above Bent County <br />Canal as each step arrives ~t that site <br />beginning about 8:30 a.m. <br />You should be on-site at 8:00 a.m. AFter <br />stage 'has leveled out at about 1,000 cfs <br />and final measurement has been made travel <br />to Lamar Canal headgates to assist first <br />team in measurements after 5:00 p.m. <br /> <br />4-2-76 <br /> <br />Measure Arkansas River above Bent County <br />Canal. Measure Bent County Canal at <br />first available bridge downstream. <br />Measure Arkansas River near Coolidge. <br /> <br />Equipment required: <br /> <br />1. Wading equipment for stream measurements <br /> <br />2. Boat and equipment should be available if required <br /> <br />3. Conductivity meter <br /> <br />4. 8 dozen sediment bottles <br /> <br />5. DH 48 sediment sampler <br /> <br />6. 1 bottle carrier <br /> <br />7. Flashlights <br /> <br />2 <br />