Laserfiche WebLink
<br />1"- . <br /> <br />The following paragraphs describe the current plan. It appears to <br />be more environmentally acceptable than the plan presented in the auLhor- <br />izing document and would contribute less salinity to the Colorado River. <br /> <br />The main storage feature of the project would be Ridges Basin. <br />Reservoir, located southwest of the City of .Durango. The Durango <br />Pumping Plant, south of the city, would pump Animas River water to <br />Ridges Basin Reservoir. Stored water would be released as required <br />back to the Animas River for Aztec, Farmington and other potential <br />municipal and i"dustrial us"rs in New Mexico. Durango and surrounding. <br />communities would construct a treatment plant immediately north of the <br />reservoir and would also obtain their additional municipal and industri.ll <br />water from Ridges Basin Reservoir. <br /> <br />In addition to storing a portio!, of Durango I s municipal and indus- <br />trial water, Ridges Basin Reservoir would also provide storage for the <br />Ute 110untain .Ute Indian tribe's industrial and irrigation water, t~e <br />Southern Ute trib.e' s irrigation water and. water for the Colorado <br />irrigators. <br /> <br />The Ridges Basin Pumping Plant, located on the western edge of <br />the reservoir, would .pump water from the .reservoir into Dry Side Canal <br />which would then convey the water to the La Plata drainage. Southern <br />Ute Reservoir would store La Plata River flows diverted into the reser- <br />voir thr.ough a diversion dam and canal. The reservoir wo.uld be the <br />storage facility for Southern Ute Indian municipal and industrial water <br />and New Mexico irrigation water. <br /> <br />Various methods of providing irrigation water to lands above the <br />Dry Side Canal are being .considered. Sprinkler irrigation is currently <br />planned for all project lands below the Dry Side Canal. The lateral <br />systems would provide sprinkler pressure a~ each farm turnout. Project <br />drainage would also be furnished, where required, on project land. <br />Fisheries would be created in the inactive pouls of project reservoirs. <br />In addition, recreational facilities would be provided at those reser- <br />voirs. A minimum stream flow of 125 cubic feet per second is planned <br />in the Animas River below.:the Durango Pumping Plant. <br /> <br />Project costs, including operation and maintenance, have been <br />estimated for plan formulatio.n purposes onl):'. No detailed engineerinfl <br />sizing and cos.ting have been done for project facilities. <br /> <br />.- <br /> <br />2 <br />