Laserfiche WebLink
<br />;(~""'-il;'-AJt-.,~'b ORDER OFE)(ENTS FOR EIS PREPARATION <br />1:.."L ~IO ";1' 'Occ,.J...--I.t..> <br />......u ik. - Te>SCO )~~\NIII'ICI'W'>o Resp?n~ible <br />,.10 r'- OfficIal <br />1. ASFE Notifies NEPA Affairs DOE 5440.1, Sec. 5c <br />o Designate officals responsible LH <br /> <br />2. <br /> <br />NAD. G. C. <br />FE. LETC <br /> <br />Determine Appropriate NEPA documentation <br />40 CFR 1507.3(b) (2); DOE A.2(a) <br /> <br />3. <br /> <br />Prepare Implementation Plan for Internal Use <br />DOE 5440.1. Sec 4e <br />a. Summary of means by which EIS is to be <br />p repa red. <br />b. Professional level of effort and disciplines <br />involved. <br />c. Scope of work for contractual assistance. <br />d. EIS outline. <br />e. Contractual organization. involved. <br />f. Publication requirements. <br />g. Project manager. <br />h. Prime contacts within DOE. <br />i. Timetable for preparation. <br /> <br />LH <br /> <br />4. <br /> <br />LH <br /> <br />Procurement started. <br />Procurement awarded. <br /> <br />a. <br />b. <br /> <br />5. <br /> <br />Notice of intent to prepare EIS 20 40 CFR 1501.7. Argonne <br />40 CFR 1508.22. 40 CFR 1506.6, DOE A.3. <br /> <br />G/~ V~O <br /> <br />Date <br />Scheduled Actual <br /> <br />3/80 <br /> <br />4/80 <br /> <br />1,/80 <br /> <br />1/80 <br />bleO <br /> <br />6/80 <br /> <br />LH or SPO <br />Scoping Meeting. 40 CFR 1501.7; A.4 ~ Argonne 8/80 <br />o Determine Scope. AI ~ oS- :PIs. <br />o Identify and eliminate issues. g;!Jlt /II\t,1\~ ~tlC.. 0) -, <br />o Allocate assignments. II~O'"~. G--..) l/lW'.".v <br />o Indicate related ElS's. I '1 <br />o 10 after environmental review and consultation <br />requirements. <br />o Relationship of EIS & agency decision. <br />o Set page and time limits. <br /> <br />6. <br /> <br />7. <br /> <br />SPO - <br />Argonne <br /> <br />Complete Implementation Plan A.3.b. <br />o EIS scope. <br />o 10 & el iminate issues <br />o Indicate related EA's & EIS's. <br />o 10 after review and consultation requirements. <br />o Relationship between timing of EIS & agency's <br />decision making process. <br />o Detai lEIS outl ine. <br />o How EIS will be prepared. <br />o Page 1 imits, time limits, assignments. <br /> <br />8. Prepare DEIS 1502.9. 1502.10 (6 mo-l yr). <br /> <br />Argonne <br /> <br />9. Internal Review & Approval (DOE 5440.1. Sec. <br />5.b(I) (d) (3 mo). <br /> <br />NAD/GC <br /> <br />10. Print DEIS (1 mo). <br /> <br />Argonne <br /> <br />8/80 <br /> <br />6/80-2/81 <br /> <br />2/81-6/81 <br /> <br />6/81-7/81 <br /> <br />d_._~{1_~s_ .... <br />