My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02125
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP02125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:23 PM
Creation date
10/11/2006 10:55:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.260
Description
Section D General Studies-Oil Shale/Coal
Date
6/23/1980
Title
Oil Shale DOE EIS-Oil Shale Surface PON-Order of Events for EIS Preparation
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORDER OF EVENTS FOR EIS PREPARATION <br /> <br />1. <br /> <br />ASFE Notifies NEPA Affairs DOE 5440.1. Sec. 5c <br />o Designate officals responsible <br /> <br />2. <br /> <br />Determine Appropriate NEPA documentation <br />40 CFR 15D7.3(b)(2); DOE A.2(a) <br /> <br />Responsible <br />Official <br /> <br />LH <br /> <br />NAD, G.C. <br />FE, LETC <br /> <br />Date <br />Scheduled Actua] <br /> <br />3/80 <br /> <br />4/80 <br /> <br />3. Prepare Implementation Plan for Internal Use <br /> DOE 5440.1, See 413 LH 4/80 <br /> a. Summary of means by which EIS is to be <br /> prepared. <br /> b. Professional level of effort and disc i p 1 i nes <br /> involved. <br /> c. Scope of work for contractual assistance. <br /> d. EIS outl ine. <br /> e. Contractual organization, involved. <br /> f. Publ icat ion requirements. <br /> g. Project manager. <br /> h. Pr ime contacts within DOE. <br /> i. Timetab]e for preparation. <br /> <br />4. <br /> <br />a. <br />b. <br /> <br />Procurement started. <br />Procurement awarded. <br /> <br />5. <br /> <br />LH <br /> <br />Notice of intent to prepare EIS 20 40 CFR 1501.7. Argonne <br />40 CFR 1508.22, 40 CFR 1506.6, DOE A.3. <br /> <br />6. <br /> <br />Scoping Meeting. 40 CFR 1501.7; A.4 <br />o Determine Scope. <br />o Identify and eliminate issues. <br />o Al locate assignments. <br />o Indicate related EIS's. <br />o 10 after environmental review and consultation <br />requirements. <br />Relationship of EIS & agency decision. <br />Set page and time limits. <br /> <br />o <br />o <br /> <br />7. <br /> <br />Complete Implementation Plan A.3.b. <br />o EIS scope. <br />o 10 & el iminate issues <br />o Indicate related EA's & EIS's. <br />o 10 after review and consultation requirements. <br />o Relationship between timing of EIS & agency's <br />decision making process. <br />o Detail EIS outline. <br />o How EIS wil I be prepared. <br />o Pa9c 1 imi ts, time 1 imi ts, assignments. <br /> <br />8. Prep" re DE I S 1502.9. 1502. 1 0 (6 mo-l y r) . <br /> <br />9. Internal Review & Approval (DOE 5440.1, Sec. <br />5.b(l) (d) (3 mol. <br /> <br />10. Print DEIS (1 mo). <br /> <br />LH or SPO <br />Argonne <br /> <br />SPO - <br />Argonne <br /> <br />Argonne <br /> <br />NAD/GC <br /> <br />Argonne <br /> <br />1/8n <br />b/~O <br /> <br />6/80 <br /> <br />8/80 <br /> <br />8/80 <br /> <br />6/80-2/81 <br /> <br />2/81-6/81 <br /> <br />6/81-718] <br /> <br />0358 <br />
The URL can be used to link to this page
Your browser does not support the video tag.