My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02125
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP02125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:23 PM
Creation date
10/11/2006 10:55:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.260
Description
Section D General Studies-Oil Shale/Coal
Date
6/23/1980
Title
Oil Shale DOE EIS-Oil Shale Surface PON-Order of Events for EIS Preparation
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J/> 17. <br /> <br />11. <br /> <br />Ci rculate DEIS 1502.19; 8.2(a) (5) for pub! ic <br />Comment. (Minimum 45 days) (1506.10c). <br /> <br />Respons i b I e <br />Official <br /> <br />spa - Argonne <br /> <br />spa - Argonne <br /> <br />EIS Participants <br />SPO - Argonne <br /> <br />~~D - GC <br /> <br />Argonne <br /> <br />SPO - Argonne <br /> <br />FE - SPO <br /> <br />FE <br /> <br />FE <br /> <br />"*During Phase II <br /> <br />)I} Requi red prior to selection of Phase II Participants <br /> <br />12. <br /> <br />Possible Publ ic Hearing 1506.6 (15 day notice). <br /> <br />13. <br /> <br />Respond to comments (1503.4) and prepare Final <br />(1502.9) 4 mo. <br /> <br />14. <br /> <br />Internal Review & Approval (DOE 5440.1, Sec. <br />5.b. (1) (d); C.4 (1-3 mo). <br /> <br />15. <br />16. <br /> <br />Printing (1 mo). <br /> <br />Circulate FEIS 1502.19; 8.2(a) (5) for publ ic <br />comment (45 days 1506.10c). . <br /> <br />Record of Decision 1505.1 and 1505.2; B. 1. (a) <br />(5) (1 mo). <br /> <br />18. <br /> <br />Implementation Plan (1 mol. <br /> <br />19. <br /> <br />Carry out audit program for NEPA fol low-up <br />DOE 5480 Series. <br /> <br />*Utilize in preparation of Phase II contracts <br /> <br />Date <br />Scheduled Actual <br /> <br />7/81-9/81 <br /> <br />10/81 <br /> <br />10/81-2/81 <br /> <br />2/81-5/82 <br /> <br />5/82 <br /> <br />6/82-7/82 <br /> <br />7/82 <br /> <br />:;; <br /> <br />:;~ :'; <br /> <br />0361 <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.