My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02125
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP02125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:23 PM
Creation date
10/11/2006 10:55:39 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.260
Description
Section D General Studies-Oil Shale/Coal
Date
6/23/1980
Title
Oil Shale DOE EIS-Oil Shale Surface PON-Order of Events for EIS Preparation
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OROER OF EVENTS FOR EIS PREPARATION <br /> <br />Responsible <br />Official <br /> <br />Oate <br />Scheduled Actual <br /> <br />ASFE Notifies NEPA Affairs OOE 5440.1, Sec. 5c <br />o Oesignate officals responsible <br /> <br />1. <br /> <br />3/80 <br /> <br />LH <br /> <br />NAO, G.C. <br />FE, LETC <br /> <br />2. <br /> <br />Oetermine Appropriate NEPA documentation <br />40 CFR 1507.3(b) (2); DOE A.2(a) <br /> <br />4/80 <br /> <br />3. <br /> <br />Prepare Implementation Plan for Internal Use <br />DOE 5440.1. See 4e <br />a. Summary of means by which EIS is to be <br />prepared. <br />b. Professional level of effort and disciplines <br />involved. <br />c. Scope of work for contractual assistance. <br />d. EIS out1 ine. <br />e. Contractual organization, involved. <br />f. Publication requirements. <br />g. Project manager. <br />h. Prime contacts within DOE. <br />i. Timetable for preparation. <br /> <br />lJ/80 <br /> <br />LH <br /> <br /> LH 1/80 <br /> b/eo <br />1501.7. Argonne 6/80 <br /> LH or SPO <br /> Argonne 8/80 <br /> <br />4. <br /> <br />Procurement started. <br />Procurement awarded. <br /> <br />a. <br />b. <br /> <br />5. Notice of intent to prepare EIS 20 40 CFR <br />40 CFR 1508.22, 40 CFR 1506.6, OOE A.3. <br /> <br />6. Scoping Meeting. 40 CFR 1501.7; A.4 <br />o Determine Scope. <br />o Identify and el iminate issues. <br />o Allocate assignments. <br />o Indicate related EIS's. <br />o ID after environmental review and consultation <br />requirements. <br />o Relationship of EIS & agency decision. <br />o Set page and time limits. <br /> <br />SPO - <br />Argonne <br /> <br />8/80 <br /> <br />Complete Implementation Plan A.3.b. <br />o EIS scope. <br />o ID & el iminate issues <br />o Indicate related EA's & EIS's. <br />o ID after review and consultation requirements. <br />o Relationship between timing of EIS.& agency's <br />decision making process. <br />Det~il EIS outl ine. <br />How EIS will be prepared. <br />Page 1 imi ts, time J imi ts, assignments. <br /> <br />7. <br /> <br />o <br />o <br />o <br /> <br />Prepure OEIS 1502.9. 1502.10 (6 mo-l yr). <br /> <br />8. <br /> <br />6/80-2/81 <br /> <br />Argonne <br /> <br />Internal Review & Approval (DOE 5440.1. Sec. <br />5.b(l) (d) () mol. <br /> <br />NAD/GC <br /> <br />2/81-6/81 <br /> <br />9. <br /> <br />10. Print DEIS (1 mo). <br /> <br />6/81-7/81 <br /> <br />Argonne <br /> <br />~.~5J <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.