Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.' <br />.0 . <br /> <br />Allowable Evaporation Pool Contents: <br /> <br />State = 272.5 (.50) = 136.25 a. f. <br />Indian Hills = 136.25 ( .082) = 11.17 a.f. <br />Genesee = 136.25 (.328) = 44.69 a. f. <br />Evergreen = 136.25 (.426) = 58.04 a.f. <br />Morrison = 136.25 (.164 ) = 22.34 a.f. <br /> 272.5 <br /> <br />When each entity's storage account and evaporation loss account <br />are full, inflows could not be stored and will be released to <br />the river. <br /> <br />Example Operations Study <br /> <br />To illustrate the operations study procedures described <br />herein, the Colorado Water Conservation Board staff has taken <br />the estimated storable inflows and releases to the river from a <br />first draft of a Bear Creek Reservoir Operations Study prepared <br />by WWE in 1979 and has conducted an operations study for W.Y. <br />1954. This study is attached as Appendix A and will serve as a <br />guide as to how the consultant is to conduct the current study. <br /> <br />In this example study, the estimated storable inflows and <br />releases to the river are based on incomplete data. The <br />example study should, therefore, be viewed as a sample <br />calculation, not as a valid study. It does, however, point out <br />the need for each entity to carefully evaluate how much water <br />it needs to store to meet its release requirements and <br />evaporation loss obligations. <br /> <br />Study Products <br /> <br />The consultant shall prepare 25 copies of a draft final <br />report. This report will show the monthly fluctuations in the <br />water surface elevation of Bear Creek Reservoir under Scenarios <br />A, B & C during the sele9ted hydrologic cycles. In addition <br />the study will show whether each entity has allocated <br />sufficient water rights for storage in Bear Creek Reservoir to <br />meet its augmentation requirements and its evaporation losses. <br />After review and comments are made by the parties involved, 25 <br />copies of a final report shall be prepared. <br /> <br />-9- <br />