My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02110
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:33 PM
Creation date
10/11/2006 10:55:15 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.430
Description
Colorado River Basin Organizations-Entities - Gunnison - UVWUA - AB Lateral
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/28/1990
Author
BOR
Title
AB Lateral Hydropower Project - Supplemental Environmental Impact Report - 1990 Summary of Final EIS and 1991 Record of Decision
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1"t! ,~:~: ~ ' <br />,'I, ,t, S <br />..... -' _. -I .Ii' <br /> <br />!~,j <br /> <br />I" <br /> <br />RECORD OF DECISION <br /> <br />UNCOMPAHGRE VALLEY RECLAMATION PROJECT <br />AB LATERAL HYDROPOWER FACILITY <br />FINAL ENVIRONMENTAL IMPACT STATEMENT <br /> <br />I. INTRODUCTION <br /> <br />This record of decision (ROD) of the Department of the Interior, <br />Bureau of Reclamation (ReClamation), documents the decision <br />process of whether to approve or disapprove the proposed <br />AB Lateral Hyd~opower Facility (Facility) as analyzed in the <br />Final Environmental Impact Statement (FEIS) (INT-FES 90-25, dated <br />August 28, 1990), prepared in compliance with the National <br />Environmental Policy Act (NEPA) of 1969. <br /> <br />The proposed Facility, a non-Federal project, would be funded, <br />constructed, and operated by the Uncompahgre Valley Water Users <br />Association (UVWUA) and Montrose Partners, jointly referred to as <br />the Sponsors. The Sponsors propose to construct the Facility <br />using existing features of the Uncompahgre Valley Reclamation <br />Project (UVRP), an irrigation project originally constructed by <br />Reclamation. Ownership of the Facility may ultimately be <br />transferred to the UVWUA. The UVRP was authorized by the <br />Secretary of the Interior on March 14, 1903, under the provisions <br />of t~e Reclamation Act. Hydropower development in association <br />with the UVRP was authorized by the Congress June 22, 1938 <br />(PUblic Law 75-698, stat. 941). <br /> <br />The proposed Facility would be located in western Colorado in <br />Montrose County. Electric power' from the proposed Facility would <br />initially be spld to the Public Service Company of Colorado under <br />a contract approved by the Colorado Public utilities Commission. <br /> <br />Alternatives considered for the Facility include the no action <br />alternative as well as four hydropower alternatives that provide <br />for various amounts of water diversions from the Gunnison River <br />through the existing Gunnison Tunnel to varying siz~s of <br />penstocks and powerplants to be constructed near Montrose, <br />Colorado. The; sponsors are requesting from Reclamation a <br />contract, also known as a lease of power privilege contract, that <br />would permit using UVRP facilities for the hydropower <br />development. <br /> <br />-- <br /> <br />,;' <br /> <br />': <br /> <br />j <br />i <br />.'i <br />1" $ <br />::t <br /> <br />i <br /> <br />:r <br /> <br />'I <br /> <br />,ft: <br /> <br />~ <br />., <br /> <br />E <br /> <br />,; <br />\; <br />.'1 <br /> <br />.4 <br /> <br />~; <br />>.1 <br /> <br />;; <br /> <br />~{ <br />-;~ <br /> <br />~ <br /> <br />:) <br />3 <br />'~ <br />.. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.