My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02108
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:32 PM
Creation date
10/11/2006 10:55:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.600
Description
Colorado River Basin Salinity Control - Federal Agencies - USDA
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1996
Author
Draper
Title
Colorado River Salinity Control Program - McElmo Creek Unit - Monitoring and Evaluation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 8 Cosl per Ton of Salt Reduced <br /> <br />tv <br />t.., <br />,.,'Jo <br />c,.J <br /> <br />Cumulative Federal Dollar.; <br /> <br />Financial Assistance. <br />Technical Assistance <br />Information & Education <br />Total <br />Amortized TotaJ 2S year 7.75% <br />Reported Salt Reduction <br />Federal DolIlll'!i ner Ton ner Year <br /> <br />2,868,276 <br />2,787,000 <br />561.035 <br />6,216,311 <br />569,974 <br />11,051 <br />5158 <br /> <br />.Dollars spent on installed practices. <br />The budgeted amount for Financial Assistance is 3,665,212. <br />Salt Reduction and Financial Assistance are from the IT <br />. 1995 CRSC Annual Progn:ss Repon. The ssJt reduction tons <br />pcr year do not rellect the potential from the planning effort <br />or education provided. <br /> <br />C, Summary and <br />Recommendations <br /> <br />The benefits of reduced irrigation labor <br />requirements and increased yields offset the <br />annual cost of installing an improved system, <br />These impacts were displayed in comparison <br />budgets (included in last years report) from <br />interviews of individual producers in the project <br />area. <br /> <br />It is recommended that conservationist maintain <br />or enhance their efforts to provide soJid economic <br />data to producers for use in their decision making <br />process, <br /> <br />A larger effort needs to be made to gain solid data <br />on "after" or implemented conditions to show the <br />long tenn effects of the program. <br /> <br />Considerations should be made on the benefits of <br />further evalualions on planned conditions. Four <br />years of evaluations on planned conditions <br />provide good support to continue with project <br />implementation. <br /> <br />McElmo Creek Unit M&E 1995 Report <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.