Laserfiche WebLink
<br />l:'- <br />C~ <br />cY:l <br /> <br />CHAPTER II <br /> <br />DESIGNS AND ESTIMATES <br /> <br />Operation, Maintenance, and Replacement Costs <br /> <br />Annual operation, maintenance, and replacement cOsts of new project <br />works are estimated at ,]16,250. These costs are based on average 1939- <br />1944 prices which are considered representative .of prices over an <br />extended period in the future. The replacement costs were computed on a <br />sinking fund basis without interest over a 50-year period. <br /> <br />The annual costs are given by project feature in the table below. <br /> <br /> nua oos s <br /> Feature Operati en and <br /> naintenance Reola cement s Total <br />Rifle Gap Dam and Reservoir $2,)00 $ 700 '\ <br /> 11>3,000 <br />Davie ditoh pumping unit 350 250 600 <br />Davie ditch 700 300 l,OOO <br />Grass Valley Oanall! 1,000 500 1,500 <br />Drains 150 -- l50 <br />Total $4.50u $1. 750 ~b, 250 <br />ijRepresents total costs for this canal with project. This would <br /> <br />ESTIMATED ANNUAL OPERATION, MAIN'IENANCE, <br />AND REPLAOEMl!NT OooTS <br />An 1 t <br /> <br />be a saving of about $640 annually over present costs. <br /> <br />17 <br />