Laserfiche WebLink
<br />, <br /> <br />A. For a selected probability plot up draw down vs. use curve. (See Graph # 2) <br /> <br />B. For a given drawdown determine drawdown period length. <br /> <br />C. For given future schedule determine shortage trigger: Storage required <br />to allow constant shortage release and provide specified probability of <br />protection of not dropping below target elevation. <br /> <br />D. For given future schedule determine normal trigger: Storage required <br />above shortage storage, to allow constant normal release and provide <br />specified probability of protection of not dropping below shortage <br />trigger. <br />