Laserfiche WebLink
<br /> <br />'.--';.,- "<_' i::.'~ '.;' " -.., ". <br /> <br />:-.;,..:-,-, <br /> <br />,~;;'fI' <br />~.':".S.. <br />'..:"'.;;;.' <br /> <br />. . "-V:; '. <br /> <br />f~18~ <br /> <br />. <br /> <br />4-16-52 <br /> <br />Sediment control <br /> <br />t\) <br />l"V <br />...:I <br />(0 <br /> <br />Sediments transported by the Arkansas River constitute a <br /> <br />"perennial problem and expense to the water users in the Arkansas <br /> <br />Valley through deposition at the headworks, in the canals and <br /> <br />.' <br />., <br /> <br />reservoirs, and on the irrigated land. Provisions are made in <br /> <br />~- <br /> <br />the proposed Pueblo Reservoir for the capture of about 944 acre-feet <br /> <br /> <br />of sedilllent annually. Because the heavy bed load is characteristic <br /> <br />of the headwater strealll8, the reUefto the downstream water users <br /> <br />would be greater than that indicated by the proportion of the sedi- <br /> <br />rnent retai.ned. <br /> <br />It is estiIMted that the control of sediment in Pueblo Reser- <br /> <br /> <br />voir would result in an annual J;laving in operating ecxpense to <br />downstream users in the amount of ~141~OOO. <br /> <br />Benefit-Cost comparison <br /> <br />5umnll.r1zing the estimated annual tangible benefits resulting <br /> <br />from the proposed project development we have: <br /> <br />.j,....: <br /> <br />Agricultural benefits. . . . . . $ 2,903,000 <br />Hydroelect.ric power. . . . . . . 4,064,000 <br />Nunicipal water. . . .. . . . . . l,662,OOO <br />Flood control. . . . . . . . 583,000 <br />Sediment control . . . . . . . . 141,000 <br />Total benefits . . . . . . . $ 9,353,000 <br /> <br />'.",''' ~ <br />~ .:.,'. <br />:~':':> ' <br /> <br />\,~<,' <br /> <br />;": :~. <br /> <br />'.'.,.' <br /> <br />.,. <br />\-..:"': <br />.,' <br />>j\:;: <br /> <br />The annual equivalent Federal oost of the Fryingpan../l.rkansas <br />Project is estiIMted at $5,566,000. 'l:'his cost includes annual <br /> <br />;, ;:(~.;: <br /> <br />".\.::. <br />,<~f:. <br />f? <br />,>'.,> <br /> <br />operation, maintenance and replacement reserve, and an annual <br /> <br />"" <br /> <br />equivalent investment cost based on amortization of the net <br />public investment in construction cost at 2-1/2 percent interest <br /> <br />in 100 years. <br /> <br />......;:. <br /> <br />:':, '. ';. <br />,,' , <br /> <br />19 <br /> <br />:-.:..' <br /> <br />t:C''''~",t,,;)t;':4,:r:t~;z;li;)~~~ti_E~;~~~)~5f';~;~i;;i}1;(1i~f' <br /> <br /> <br />:.::::_~ ,;_.:;~.:.V'<;>~<:"._ '{' :'; <br /> <br />- <br /> <br />.,.1 <br />.-.<'" <br /> <br /> <br />,.. <br />.:;-v <br />ji.-',.; <br /> <br /> <br /> <br />.~- . <br /> <br />.> <br /> <br />--> <br /> <br />.i. <br /> <br />