Laserfiche WebLink
<br />'From Figure 3: <br /> <br />t T/a2S ~ 0.17 <br />-p~ <br /> <br />"" <br />t = (0.17) (209) = 35~ days <br />-p <br /> <br />check by using Table 1 <br /> <br /> Net Net <br />(.:!, + !!)!/l~ Vl T/a2 S !i!/~ ~ ~ iT.JQi ~ VT/Qa2 S Acre-f~ <br />- --- - -- <br /> - <br />0.72 0.156 0.55 0.092 0.064 27 <br /> <br />try <br /> <br />t = 33\ days, t T / a2 S = 0.16 <br />- p -p- <br /> <br />0.72 <br /> <br />0.156 <br /> <br />0.56 <br /> <br />0.095 <br /> <br />0.061 <br /> <br />25 <br /> <br />therefore the irrigator can begin pumping at the beginning of the <br /> <br />season and pump at a rate of 2 acre-ft/day for 33~ days. <br /> <br />, <br /> <br />. <br />"0 <br />:>0 <br /> <br />29 <br />