My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02006
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:54 PM
Creation date
10/11/2006 10:47:41 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.J
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/8/1986
Author
Hydro-Triad Ltd.
Title
Reformulation of the West Divide Project - Executive Summary - August 8 - 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ctl <br />~ <br />m <br />C:J <br /> <br />filling. During the spring snowmelt there is plenty of water for most <br />senior rights. By late summer, when natural flows have subsided and <br />irrigation demand is high, ~he Cameo diversions will place a call on <br />the .river, preventing most upstream reservoirs from continuing to <br />fill. Releases from Green Mountain Reservoir are irtCreased during <br />this period to mitigate the effe~ts of the, water right call. <br /> <br />2. Project Area <br /> <br />The project area is comprised of nine major drainage basins: <br />West Divide Creek, Alkali Creek, East Divide Creek, Hamm Creek, Dry <br />Hollow Creek, Yank Creek, Thomps.on Creek, Owens Creek, and Buzzard <br />Creek. The total amount of presently irrigated areas is about 14,900 <br />acres and the total number of potential irrigated acres is, about <br />19,600 in all these basins combined. <br /> <br />The average annual diversion requirement for the project area <br />crops is 3.12 feet per acre'. On the average, sixty,-four percent of <br />the total amount diverted for irrigation is lost to the atmosphere <br />through crop evapotranspiration. Thus the average annual consumptive <br />use is 2.0 ac-ft per acre. The remaining 1.12 feet represents system <br />losses such as canal seepage, and direct runoff from irrigation <br />(return flows), which may eventually appear elsewhere i~ the basins <br />for possible reuse. <br /> <br />Because no water storage or reservoirs currently exists <br />within any of these basins, the present pattern 'of irrigation involves <br />flooding the irrigated areas with as much water as possible in Mal' and <br />June. By early July the normal stream flow drops to levels which <br />preclude or markedly reduces further irrigation. Irrigated crops must <br />survive the' remainder of the growing season on residual soil moisture <br />and available precipitation. The average annual amount of, water <br />available in the project area is 88,300 acre-feet. The total amount <br />required for diversion to .existing irrigated area averages 46,500 <br />acre-feet per year, and the average annual existing shortage is 23,900 <br />acre-feet. <br /> <br />There are about 9,150 acres of land in the existing We.st <br />Divide Creek irrigation system which are presently irrigated from four <br />major irrigation ditches. These ditches are supplied by West Divide <br />Creek, Dry Hollow Creek and Alkali Creek, The average annual diver- <br />sion requirement for irrigated lands is 28,550 acre-feet. The average <br />annual flow in the West Divide Creek system is almost 30,800 ,acre-feet <br />or 2,250 acre-feet more than the average annual diversion requirement. <br />Irrigation water shortages exist because the distribution of annual <br />flows does not coincide with, the distribution of annual demand. <br /> <br />1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.