|
<br />Table 4. Onsite measurements and chemical data for surface-water sites in the Uncompahgre Project area,
<br />1991-92.-Continued
<br /> Speclllc pH, Water
<br /> Site Stream lIeld
<br /> code Site name Date TIme discharge conduc- (stan. temper-
<br /> (pl. t) (1t'/.) tBnce dard sture
<br /> (~S1cm) units) (oC)
<br />UCI6 Uncompahgre River at Della 10-21-91 0930 254 1,510 8.4 9,0
<br />UCI6 11-07-91 1010 221 1,720 8,3 9.0
<br />UC16 11-13-91 t200 260 1,630 8.3 7,0
<br />UCI6 12-12-91 0850 229 1,730 8.2 3.0
<br />UCI6 01-14-92 1200 118 1,970 8.4 0
<br />UCI6 02-19-92 0840 124 2.090 8,3 1.0
<br />UCI6 03-19-92 1040 192 1,580 8.4 6.5
<br />UCI6 03-27-92 1245 183 1,490 8,3 11.0
<br />UCI6 04-22-92 1130 315 1,050 8.3 11.0
<br />UCI6 05-12-92 1130 380 1,150 8,2 14.0
<br />UCI6 06-10-92 1200 525 1,120 8,3 16,0
<br />UCI6 06-18-92 1055 415 1,230 8,5 15.0
<br />UCI6 08-13-92 1055 351 1,430 8.3 17,0
<br />WST West Canal at Highway 550 02-19-92 1130 4.4 788 8,3 2.0
<br />MDCI Montrose and Delta Canal at Highway 90 02-12-92 0920 20 835 8.3 ,5
<br />MDC2 Montrose and Delta Canal at Hickory Road 02-11-92 1030 5.1 1,030 8,3 3.5
<br />HFC Horsefly Creek al Racine Road, near mouth 07-17-91 0930 5,3 480 8.0 14,0
<br />HFC 02-2()"92 1025 .32 1.840 7.9 0
<br />HCCI Happy Canyon Creek at Marine Road, near 07-17-91 1210 44 927 8.1 16.5
<br /> mouth
<br />HCCI 02-20-92 1310 5,7 1,470 8.6 6.0
<br />HCC2 Happy Canyon Creek above Dolores Creek 02-2()"92 0920 .50 2,430 8,0 2.0
<br />DOL Dolores Creek at mouth 02-20-92 0910 1.9 1,530 8.1 ,5
<br />MXG Mexican Gulch al LaSalle Road, near mouth 02-20-92 1040 1.4 940 8,0 5.5
<br />SPI Spring Creek at Jay-Jay Road. near mouth 07-24-91 1315 89 840 7,6 18.5
<br />SPI 01-12-92 1250 14 1,540 8.4 7.5
<br />SPI 02-19-92 1050 8,2 1,470 8.6 2,0
<br />SPZ Spring Creek. at Maple Grove Road 01-12-92 1200 4,0 945 8.4 2.5
<br />SP3 Spring Creek at Highway 90, at Oak Grove 02-12-92 1040 :J.9 755 8.4 3,0
<br />SP4 Spring Creek at Poplar Road, below West Canal 07-24-91 0930 ,81 692 7,8 16,0
<br />SP4 02-12-92 0800 1.4 741 8,2 0
<br />IRCl tronstone Canal at Highway 348 and 5700 Road 02- II -92 1400 1.840 8,3 3.5
<br />IRC2 Ironstone Canal at 5400 Road 01-29-92 1045 5,3 1,530 8,0 .5
<br />UNBL Unnamed drainage at Blossom Road, near 02-20-92 1150 ,II 5.370 7,9 7.0
<br /> Chipeta
<br />UNDI Ditch at Ash Mesa Road, upper ditch 02-2()"92 1245 1.5 1,400 8.1 9.5
<br />UND2 Ditch at D 10 and Ash Mesa Roads 02-20-92 1320 .48 1,320 8.0 8.5
<br />28 Physical, Chemleel, and Blologlcel Data lor the Detailed Study ollrrlgetlon Drainage In the Uncompahgre Project Aree
<br /> and In the Grand Valley, Wast-central Colorado, 1991-92
<br />
|