My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01948
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:31 PM
Creation date
10/11/2006 10:46:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
4/9/2003
Author
UCRBRIP
Title
2002 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY2002 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: C-6 construction <br /> <br />I. Project Title: <br /> <br />Habitat restoration and enhancement (construction) for the Upper Colorado River <br />Endangered Fish Recovery Program <br /> <br />II. Submitted by: Pat Nelson <br />U.S. Fish and Wildlife Service <br />44 Union Blvd. #120 <br />Lakewood, Colorado 80228 <br />Phone (303) 969-7322 Ext 226 <br />FAX (303) 969-7327 <br />pat_nelson@fws.gov <br /> <br />III. Project Summary: <br /> <br />The goal of the Habitat Restoration Program is to restore or enhance natural floodplain <br />functions that support recovery of endangered fishes in the upper Colorado River basin. <br />Construction is used to restore river-floodplain connectivity and to provide access to and from <br />the floodplain for endangered fishes. Construction had been planned for three sites during FY <br />2002. Construction has not begun on any of the sites for reasons identified in section VI. <br /> <br />IV. Project Schedule: <br /> <br />Initial Year: 1997 <br />Final Year: TBD <br /> <br />V. Relationship to RIPRAP: <br />GREEN RIVER ACTION PLAN: MAINSTEM <br />II. Restore habitat <br />II.A. Restore and manage flooded bottomland habitat. <br />II.A.3. Implement levee removal strategy at high-priority sites <br />II.A.3.b. Construction (levee breaching). <br />COLORADO RIVER ACTION PLAN: MAINSTEM <br />II. Restore habitat <br />II.A. Restore and manage flooded bottomland habitat. <br />II.A.4. Implement levee removal strategy at high-priority sites <br />II.A.4. b. Construction (levee breaching). <br />COLORADO RIVER ACTION PLAN: GUNNISON RIVER <br />II. Restore habitat <br />II.A. Restore and manage flooded bottomland habitat. <br /> <br />C-6 construction page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.