My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01948
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:31 PM
Creation date
10/11/2006 10:46:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
4/9/2003
Author
UCRBRIP
Title
2002 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task 3. Construction oversight: <br /> <br />Preparations for and attendance at a meeting in Grand Junction took place in August. <br />The purpose of the meeting was to identify any remaining issues or concerns and to concur with <br />proposed enhancements. The discussion also involved reviewing plans and proposed <br />construction for the WW, BC and GJP sites. <br /> <br />VII. Recommendations: <br /> <br />The monitoring of water surfaces and erosion and sedimentation at the bottomland and <br />river cross sections should continue in 2003 and beyond. All sites that receive significant flows <br />in the spring of 2003 should be monitored during peak flow. Monitoring the reaction of the river <br />and bottom lands to various constructed configurations will provide valuable data that can be <br />referenced in refining engineering design for future bottomlands restoration. All constructed <br />sites that receive design flow in the spring of 2003 should also be evaluated for effectiveness and <br />design modifications. Other potential sites should be surveyed, analyzed and assessed similarly <br />to those bottom lands that have been previously evaluated. <br /> <br />It is recommended that sites along the Green River, constructed between 1995 and 1999, <br />. be visited this spring to evaluate site configurations relative to the designs, note the health of <br />vegetation, photograph the site and record site observations. A memo will be forwarded locating <br />specific sites that are recommended for evaluation. <br /> <br />It is also recommended that additional discharge and water surface measurements be <br />collected at the CDOT site on the Colorado River. <br /> <br />VIII. Project Status <br /> <br />The project should be considered on-track and ongoing. Funding needs may be increased <br />for increased civil design, review of design, and assessment of additional sites as they are <br />identified. <br /> <br />IX. FY 2002 Budget Status <br /> <br />A. Funds Provided: $101,667.43 <br />B. Funds Expended: $ 84,804.40 <br />C. Difference: $ 16,863.03 <br />D. Percent of the FY 2002 work completed, and projected costs to complete: <br />Completed 83% ofFY 2002 work <br />E. Recovery Program funds spent for publication charges: $0 <br /> <br />X. Status of Data Submission (Where applicable): Not applicable <br /> <br />XI <br /> <br />Signed: <br /> <br />Peggv M. Bailev, P.E. <br />Principal Investigator <br /> <br />11 Dec 02 <br />Date <br /> <br />C-6 hyd page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.