My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01948
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:31 PM
Creation date
10/11/2006 10:46:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
4/9/2003
Author
UCRBRIP
Title
2002 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 2002 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: C-29 <br /> <br />I. Project Title: Fish Screen at the Grand Valley Irrigation Company Diversion Dam. <br /> <br />II. <br /> <br />Principal Investigator(s): <br /> <br />Bob Norman <br />Bureau of Reclamation <br />2764 Compass Drive, Suite 106 <br />Grand Junction, CO 81506 <br />Phone (970) 248-0634 <br />FAX (970) 248-0601 <br />rnorman@uc.usbr,gov <br /> <br />III. Project Summary: <br /> <br />Project Goals are to design and construct a fish screen for the Grand Valley Irrigation <br />Company (GVIC) diversion canal that will exclude, without harm, adult fish approximately 300 <br />nun in length while allowing unimpeded diversion of the GVIC's decreed water. <br /> <br />IV. Study Schedule: <br /> <br />Construction was completed in May 2002. Problems with operation will require some <br />j modifications to the canal geometry to guide the flow into the screen, Modeling by <br />Reclamation's Hydraulics Lab will be completed in February 2003. Efforts will be made to <br />make canal modifications prior to the 2003 irrigation season. <br /> <br />V, Relationship to RIPRAP: <br />COLORADO RIVER ACTION PLAN: MAINSTEM <br />II.B.1.b, Screen GVIC diversion to prevent endangered fish entrairunent. <br />II.B.I.b.(I) Design, <br />II.B, I ,b.(2) Construct. <br />II.B,1.b,(3) Operate and maintain, <br /> <br />VI. Accomplishment ofFY 02 Tasks and Deliverables, Discussion ofInitial Findings and <br />Shortcomings: <br /> <br />Design was completed and a contract was awarded to Flying Eagle Corporation on <br />September 20,2001 for the amount of $2,049,265.00 to construct the GVIC fish screen, <br />Construction began on November 5, 2001 and was substantially completed on April 13, 2002. <br />The final contract cost was $2,089,238,62, <br /> <br />Water delivery began on April I ,2002 and the screen was in operation until July 2002. <br />Operation of the fish screen was suspended for the remainder of the irrigation season due to <br /> <br />j <br /> <br />gvic screen C-29 page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.