My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01915
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:14:49 PM
Creation date
10/11/2006 10:44:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
2/11/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />litH b32 <br /> <br />. <br /> <br />. <br /> <br />has received comments from the Departments of Labor and Commerce and the <br /> <br />states of Nevada and New Mexico. <br /> <br />On the Dallas Creek project, feasibility designs and estimates have <br /> <br />been completed on the project storage features and diversion dams. Feasi- <br /> <br />bility designs and estimates on all the project ca.na.ls have been completed <br /> <br />and are under review by the Chief Engineer. Preparation of a proposed <br /> <br />feasibility report is in progress and is scheduled to be completed this <br /> <br />fiscal year. ): <br />Feasibility designs and estimates are underway for most projec0ea- <br /> <br />tures on the West Divide project. A proposed feasibility report is sched- <br /> <br />uled to be completed this fiscal year. <br /> <br />On the San Miguel project, modifications in the project plan are mov- <br /> <br />ing ahead with the objective of iJlIproving project feasibility. Plan formul- <br /> <br />lation studies are appraising the possibility of developing water for a <br /> <br />steam. electric powerplant in the San Miguel River area. The powerplant is <br /> <br />being planned by the Colorado-ute Electric Association. Preparation of <br /> <br />design data for an enlarged Radium Reservoir, Paradox Diversion Dam, and <br /> <br />extension of Paradox canal are in progress. The proposed feaSibility re- <br /> <br />port is scheduled for completion at the end of this fiscal year. <br /> <br />Land classification, agricultural economy, and water requli'ement <br /> <br />studies are underway on a representative presently undeveloped area on <br /> <br />the ~r Gunnison project to determine the scope of the feaSibility <br /> <br />studies to be tmdertaken. <br /> <br />Plan formulation studies, water supply studies, <br /> <br />and agricultural economic studies are in progress on the Battlement Mesa <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.