My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01915
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:14:49 PM
Creation date
10/11/2006 10:44:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
2/11/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l;d 1(;23 <br /> <br />. ",: ~ <br />{I/;:...:... :~.' - <br /> <br />^ <br />77,.,., "fl;,j.' , <br /> <br />I'. <br /> <br />REPORT BY TIlE BtffiEAU OF RECLAMATION, REGION 4 <br />TO THE COLORADO WM'ER CONSERVATION BOARD <br /> <br />February ll, 1965 <br /> <br />cl " <br /> <br />Since the last report to this Board in November, the prime contractor <br /> <br />at GLEN CANYON DAM has completed all work and has moved out 01' the area. <br /> <br />Work under the completion contract in the power:Plant and switchyard is pro- <br /> <br />gressing on schedule. Testing 01' Unit No.3 in the power:Plant was completed <br /> <br />during the :first week in December, and the unit was placed in commercial <br /> <br />operation on December 11, 1964. The 1'ourth unit, now Wldergoing tests, is <br /> <br />expected to go into production the week 01' February 15. Installation 01' <br /> <br />the remailling 4 turbines and generators is well underway. <br /> <br />Work on Blue Mesa Dam, ClJRECANTI UNIT,is being continued on a reduced <br /> <br />scale during the winter months, with the majority 01' the work being con- <br /> <br />centrated on construction 01' the powerplant structure and channel improve- <br /> <br /> <br />ment 1'or about 4,000 lineal. 1'eet below the damsite to give an extra 1'oot <br /> <br />or two 01' e1'1'ective power head to the turbines. Full-scale operations will <br /> <br />be resumed on the dam embaDkment as soon as weather permits in the s:pring. <br /> <br />It is expected that the dam embankment construction will be completed by <br /> <br />October 1965. More than 77 percent 01' the work on the dam has been :fin- <br /> <br />ished. Major accomplishments during 1964 include the placement 01' 130 1'eet <br /> <br />01' embankment--leaving 230 1'eet yet to be 1'inished be1'ore the crest is topped-- <br /> <br />and the virtual. completion 01' the concrete structures to serve as inlets 1'or <br /> <br />the outlet works tunnel and the spillway tunnel. <br />On January 14 a $llo,ooo contract was awarded to HUIlIphrey Contracting <br /> <br />COr:Poration 01' Wichita, Kansas, 1'or clearing the Blue Mesa Reservoir area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.