Laserfiche WebLink
<br />L,",' <br />~ <br />In <br />'P'"1 <br /> <br />CHAPTER V <br /> <br />INTERMEDIATE DEVELOPMENT <br /> <br />Ini tial <br />Length capacity <br />Canals (miles) (sec,-ft,) <br />Taylor !/41,0 240 <br />Baldwin 11,2 105 <br />Doyleville 22,0 155 <br />Hot Springs 21,0 70 <br />Slate River 10,0 300 <br />Almont 11,0 500 <br />II Under the intermediate development a 20-mile section <br />of earth canal would be substituted for the tunnel section in <br />the comprehensive development, <br /> <br />Estimated Costs <br /> <br />Construction costs of the intermediate development are estimated at <br />$36.720.900 on the basis of January 1963 prices and reconnaissance de- <br />signs, Costs for various features are itemized below, <br /> <br />East River Dam and Reservoir <br />Cement Creek Dam and Reservoir <br />Alder Creek Dam and Reservoir <br />Taylor Park Powerplant and switchyard <br />Almont Powerplant and switchyard <br />Taylor Canal <br />Baldwin Canal <br />Doyleville Canal <br />Hot Springs Canal <br />Slate River Canal <br />Almon t Canal <br />Laterals <br />Drains <br />Transmission facilities <br />Recreational facilities <br />Total <br /> <br />$5.700.000 <br />1.250.000 <br />1.200.000 <br />3.245,000 <br />3,150,000 <br />13,350,000 <br />374.000 <br />630.000 <br />1,250,,000 <br />1,133,000 <br />1.960.000 <br />233.700 <br />311.600 <br />2,220.000 <br />713,600 <br />36,720.900 <br /> <br />Annual operation. maintenance, and replacement costs are estimated <br />at $170,200 annually on the basis of 1960-62 prices and with allowances <br />made for increased operation costs of the Colorado River Storage project <br />transmission system, <br /> <br />Irrigation <br /> <br />Areas served <br /> <br />Acreages that would be furnished irrigation water under the inter- <br />mediate development are shown on the following page, <br /> <br />35 <br />