My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01912
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:22 PM
Creation date
10/11/2006 10:44:29 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.129.D
Description
Upper Gunnison Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1964
Author
USDOI - BOR
Title
Reconnaissance Report - Upper Gunnison Project-Colorado - March 1964
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Q) <br />C":i <br />In <br />~ <br /> <br />CHAPTER IV <br /> <br />COMPREHENSIVE DEVELOPMENT <br /> <br />period beginning with the rirst delivery of project water, Direct bene- <br />'. fits only compare with the costs in a ratio or 0,97 to 1, <br /> <br />Total benefits considered in the project benefit-cost comparison av- <br />erage $2.132.200 annually, These include benefits from irrigation. power. <br />rish and wildlife, and recreation as previously discussed in this chapter, <br />The benefit values are summarized below, <br /> <br />Irrigation <br />Power <br />Fish and wildlife <br />Recreation <br />Total <br /> <br />Direct <br />benefits <br />$564.000 <br />680.900 <br />218.700 <br />137,600 <br />1,601.200 <br /> <br />Indirect and <br />public benefits <br />$531.000 <br /> <br />531.000 <br /> <br />Total <br />$1,095.000 <br />680.900 <br />218,700 <br />137,600 <br />2.132.200 <br /> <br />Average annual equivalent costs determined ror comparison with the <br />benefits are estimated at $1.655,900, These costs include construction <br />costs and interest during construction at 3 percent interest, both amor- <br />tized at 3 percent interest over the 100-year period of analysis; annual <br />operation, maintenance. and replacement costs; and an assigned cost for <br />river regulatory facilities or the Colorado River Storage project, The <br />cost of regulatory facilities was based on $2 for each acre-root of an- <br />nual stream depletion attributable to the Upper Gunnison project, Deri- <br />vation of the average annual equivalent costs is shown below, <br /> <br />Construction cost <br />Interest during construction <br />Total project investment <br />Annual operation. maintenance, <br />and replacement costs <br />Share of Colorado River <br />Storage project costs <br />Total <br /> <br />Total cost <br />$41,603,800 <br />3,066,800 <br />44,670,600 <br /> <br />Average annual <br />e.'l.uivalent cost <br /> <br />$1.413,700 <br /> <br />178.600 <br /> <br />63,600 <br />1.655,900 <br /> <br />Cost Allocations <br /> <br />Preliminary allocations of project costs were made by the separable <br />costs-remaining benefits method to irrigation, power, fish and wildlife. <br />and recreation, The allocated costs include project construction costs; <br />interest during construction at 3 percent; and annual operation, mainte- <br />nance. and replacement costs, The allocations made are shown on the fol- <br />lowing page, <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.