My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01908
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:21 PM
Creation date
10/11/2006 10:43:55 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.300
Description
Title I - Merxican Deliveries
Basin
Colorado Mainstem
Date
2/1/1963
Author
USDOI/BOR
Title
Special Studies - Delivery of Water to Mexico
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />-I <br />I <br /> <br />the United States are operating successfUlly v1th a higher dissolved <br /> <br /> <br />solids content in their irrigativn _ter than "ill be present in the <br /> <br /> <br />water delivered to Mexico under the proposed plan. <br /> <br /> <br />C. Recommendations <br /> <br /> <br />It is recommended thst: <br /> <br /> <br />(1) Necessary action be initiated to allot 30,000 to 35,000 <br /> <br /> <br />additional acres of cotton to the Wellton-Mohawk <br /> <br /> <br />District, co~nc1ng v1th the 1963 crop year. <br /> <br /> <br />(2) Congressional approval snd funds be obtained to start <br /> <br /> <br />immediate construction under Phase 1. <br /> <br /> <br />(3) Upon receiving Congressional approval, collection of <br /> <br /> <br />field data and deaign studies for Rlase 2 construction <br /> <br /> <br />be initiated, including repsir of gates at Imperial Dam. <br /> <br /> <br />(4) Proper action be initiated to transfer construction of <br /> <br /> <br />the Texas Hill-Gila Siphon levee and floodwy system <br /> <br /> <br />from the Corps of Engineers to the Buresu of <br /> <br /> <br />Reclamation so that the flood protection system can <br /> <br /> <br />be constru_c:t_e_dJlimultaneousJ.y-vi-tll--the-other Y' upOsed <br /> <br /> <br />works in Phase 2. <br /> <br /> <br />(5) Additional studies (discussed below) be started at the <br /> <br /> <br />ear11est date. <br /> <br /> <br />D. Continuing Studies <br /> <br /> <br />Due to the complexity of the problems involved, the international <br /> <br /> <br />implicstions, the short period of time available for this report's <br /> <br /> <br />preparation, and the need to expand investigations to other areas and <br /> <br /> <br />to refine present data, this report must be considered as an initial <br /> <br /> <br />report . <br /> <br />I <br />I I <br />I <br />I <br />I <br />I <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.