My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01897
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:17 PM
Creation date
10/11/2006 10:41:54 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8270.100
Description
Colorado River Basin Water Quality/Salinity -- Misc Water Quality
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1977
Author
USDOI
Title
Quality of Water - Colorado River Basin - Progress Report No. 8 - January 1977
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />"'..... <br />i'\) <br /><:.~ <br /> <br />~..:: <br /> <br />. <br /> <br />. <br /> <br />~\7ICIPATED EFFECTS OF ADDITIONAL DEVELOPMENTS <br /> <br />River ~ill supply <br />irrigated lands. <br />to he depleted by <br /> <br />440 acres of new land and 3,640 acres of presently <br />Approximately 15,000 acre-feet of water is anticipated <br />this project. <br /> <br />Oil Shale Prototype Development.--It is estimated that oil shale <br />development would require 78,000 acre-feet in Colorado and 24,000 acre-feet <br />in Utah by 1990. It was also estimated that the heavy use of water would <br />not occur until about mid-1980's and by 1990 the total 102,000 acre-feet <br />would be required. <br /> <br />5. Above San Rafael River near Green River, Utah. <br /> <br />Utah Power and Light, Emery County.--The anticipated future effects <br />on the San Rafael River would be steam-electric plants depleting about <br />21,000 acre-feet of water and replacing an estimated 5,000 acres of <br />presently irrigated lands with industries. The salt was assumed to be <br />depleted with the water. The Huntington powerplant started 1- unit in <br />1975 and another is scheduled in 1977. The Emery County powerplant is <br />now under construction and the first unit is scheduled for June 1978. <br /> <br />6. Above Colorado River near Glenwood Springs <br /> <br />Denver) Englewood, Colorado Springs, and Pueblo, Colorado.--Expan- <br />sian of municipal supplies for these four cities will eventually deplete <br />the Colorado River by 235,000 acre-feet above present uses. These are <br />transmountain diversions from the Blue, Fraser, and Eagle Rivers in the <br />headwaters of the Colorado River. The diversions would vary according <br />to runoff each year. <br /> <br />M&I--Green Mountain.--Most of the water stored in Green Mountain <br />Reservoir will probably be released for industrial use in the vicinity <br />of Rifle, in Garfield County, Colorado. This depletion will ultimately <br />be about 45,000 acre-feet. <br /> <br />Homestake Project, Colorado.--The Homestake Project in Colorado, <br />constructed by the cities of Aurora and Colorado Springs, will ultimately <br />divert an additional average annual amount of 49,000 acre-feet to the <br />eastern slope from the headwaters of the Colorado River although the <br />diversions will vary from year to year. Present diversions amount to <br />about 25,000 acre-feet. <br /> <br />7. Between Colorado River near Glenwood Springs and Colorado River <br />near Cameo <br /> <br />Independence Pass.--This water is diverted from the upper Roaring <br />Fork to the east slopes of the Rocky Mountains. The present depletions <br />will ulti~ately be increased by an additional 7,000 acre-feet. <br /> <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.