My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01881
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:12 PM
Creation date
10/11/2006 10:41:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.600
Description
Platte River Basin - River Basin General Publications - Kansas General Publications
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1964
Author
BOR
Title
Kansas River Projects - 1963 Operations - 1964 Outlook
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00193: <br /> <br />. <br /> <br />1964 Plan <br /> <br />Bostwick Irrigation District in Nebraska <br /> <br />Franklin, Naponee, Franklin Pump, and Superior Canals will be operated <br />and maintained by the Irrigation District, It is estimated that 18,400 <br />acres will be irrigated in 1964. The Kansas-Bostwick Irrigation District <br />will operate the Superior-Courtland Diversion Dam and Courtland Canal <br />in Nebraska and the Bostwick Irrigation District in Nebraska will <br />operate and maintain the Courtland Lateral System in Nebraska. The <br />maintenance cost of the Diversion Dam and main Courtland Canal in <br />Nebraska is shared by the Kansas-Bostwick and Nebraska-Boatwiek Irriga- <br />tion Dis tricts. <br /> <br />Kansas-Bostwick Irrigation District No.2 <br /> <br />There are 26,500 acres expected to be irrigated in 1964, of which 9,200 <br />acres are above Lovewell Reservoir and 17,300 acres below. <br /> <br />Kirwin Irrigation Diatrict No, 1 <br /> <br />The District will operate and maintain the Kirwin system, It is <br />estimated that 9,000 acreS will be irrigated during the 1964 irrigation <br />season. <br /> <br />Webster Irrigation District No.4 <br /> <br />Of the 8,500 acres available for service under the Osborne System <br />7,500 acres are expected to be irrigated this year. Kirwin and Webster <br />Irrigation Districts are under joint management. <br /> <br />Cedar Bluff Irrigation District No.6 <br /> <br />This will be the last year of operation and maintenance by the Bureau <br />of Reclamation. It is expected that 3,000 acres will be irrigated <br />during the 1964 irrigation season. <br /> <br />. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.