My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01875
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:11 PM
Creation date
10/11/2006 10:41:26 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8271.300
Description
Colorado River Basin Salinity Control Program - General Information and Publications-Reports
Basin
Colorado Mainstem
Water Division
5
Date
10/5/1974
Title
The International Problem of the Salinity of the Lower Colorado River and the Agreement with Mexico for its Solution
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-5- <br /> <br />C) <br /> <br />~ <br />~ <br />-...J <br />Q':) <br /> <br />"(b) dcsignot,., a special representative to begin '~ork <br /> <br />immediately to find a permanent, definitive and <br /> <br />just solution of this problem. <br /> <br />"(e) instruct the special represen~ative to submit a.report <br /> <br />to him by the end of 1972; <br /> <br />"(d) submit this proposal, once it has the approval of <br /> <br />this Government to President Echeverria for his <br /> <br />consideration and approval. <br /> <br />"President Echeverria said that he recognized the good'li11 of <br /> <br />President Nixon and his interest in finding a definitive solution <br /> <br />to this problem at the earliest possible time. He added that <br /> <br />based on two recent trips to the Mexica1i Valley and his talks <br /> <br />with farmers there, his Government, while reserving its legal rights, <br /> <br />had decided to stop using waters from the Well ton-Mohawk project <br /> <br />for irrigation purposes !,hi1e waiting for receipt of the U.s. proposal <br /> <br />for a definitive solution. <br /> <br />"Both Presidents agreed to instruct their Water and Border <br /> <br />Commissioners to prepare and sign a Minute contain.ing the above <br /> <br />program. and commitments as soon as possible." <br /> <br />On July 14, the Commissioners signed a new agreement, Minute No. 241, <br /> <br />providing fo.c immediate improvement in the quality of CoJ.orado R.iver water <br /> <br />to be delivered to Nexico. This agreement, superseding Ninute NO. 218 <br /> <br />but running only until December 31, 1972 resulted in an average annual <br /> <br />.. <br /> <br />. '.'"'.' <br />. <br />....' <br />
The URL can be used to link to this page
Your browser does not support the video tag.