My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01852
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:05 PM
Creation date
10/11/2006 10:40:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Miscellaneous Small Projects and Project Studies - MWSI
State
CO
Basin
South Platte
Date
9/17/1993
Author
Hydrosphere Inc.
Title
Proposal for the Metropolitan Water Supply Investigation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Metropolitan Water Supply Investigation Proposal <br />Hydrosphere, Inc. <br /> <br />Septmber 17, 1993 <br />Page 34 <br /> <br />MWSI Project Goals and Objectives <br /> <br />In order to effectively identify and support cooperative solutions to Denver metro area <br />water supply problems the MWSI Project must achieve three objectives: 1) create a technically <br />facilitated planning process among water users, 2) develop an analytical capability sufficient <br />for evaluating the water supply yield and determining the operational aspects of a variety of <br />relatively complex water supply opportunities, and 3) conduct technical investigations as <br />needed specific to at least three most promising water supply opportunities which may include <br />a Barr Lake Plan, the Southern Water Supply Project and the conjunctive use of non-tributary <br />groundwater. <br /> <br />The MWSI Project should result in a reconnaissance level evaluation of the most <br />promising Denver metro area water supply options, captured in an executive level report. <br /> <br />A Technically Facilitated Planning Process <br /> <br />Because of its breadth of scope, the MWSI Project cannot occur in a vacuum. The <br />MWSI Project must include a strong cooperative process component in order to foster <br />collaborative planning efforts among water users and to take advantage of existing areas of <br />information and expertise. This process should allow for frequent and informal meetings with <br />key technical people from interested water providers for the purposes of brainstorming, sharing <br />of information and discussing findings. <br /> <br />The Contractor should act as "technical facilitators" by having in-depth knowledge of <br />metro area water rights and water supply issues and a wide range of analytical capabilities. <br />This in-depth level of background knowledge will serve to enhance the collaborative aspects of <br />the process by assisting water users in identifying ways to meet their individual needs through <br />cooperative measures, and providing an added value service through effective evaluation of <br />water supply options that involve the integration of elements of existing systems that have <br />historically operated in a disparate or competitive manner. <br /> <br />There are several water supply planning efforts currently underway in the metro region, <br />each of which are discussed below. The MWSI Project should be coordinated with these <br />efforts in order to minimize duplication of effort, take advantage of available information and <br />facilitate interaction among key technical people. <br /> <br />Denver Water Studv - The Denver Water Department is in the process of enhancing its <br />planning capability in order to address key water supply issues, both from Denver's <br />perspective and to some degree from a metro area-wide perspective. This effort promises to be <br />ambitious and far-reaching, although active cooperation by other players will be required for <br />its ultimate success. <br /> <br />While the scope of this study is still being defined, the first two years of this effort are <br />focused on redeveloping Denver's modeling capability in order to better estimate its system <br />yield under a variety of assumptions. Denver plans on making the resulting modeling tool <br />publicly available. This tool is expected to have considerable flexibility for examining water <br />supply options, although the model's ultimate capability to evaluate a wide range of system <br />integration'opponunities from a metro area-wide perspective is unknown. <br /> <br />Following this model development phase Denver plans to undertake a two to three year <br />planning effort in collaboration with other water users to evaluate a range of new water supply <br />sources and system management alternatives, focusing on those options which would utilize <br />excess flows divertible under Denver's water rights (e.g. its "Two Forles spills"), its excess <br />
The URL can be used to link to this page
Your browser does not support the video tag.