Laserfiche WebLink
<br />-, <br /> <br />EFFECTS OF PROJECTED DEPLETIONS ON IlYDROPOWER <br /> <br />December 1933 Capability <br />in Hega\iatts <br /> <br />Average Annual Generation <br />in ~1i11ion 1\1'/ flours <br /> <br />Current <br />1970 <br /> <br />1937 <br /> <br />9346 <br /> <br />Base Condition (H/o coal) <br />1980 <br />2000 <br />2020 <br /> <br />1894 <br />1993 <br />1884 <br /> <br />, 9123 <br />8692 <br />8137 <br /> <br />/,linimum Projection <br />1980 <br />2000 <br />2020 <br /> <br />1887 <br />1931 <br />1857 <br /> <br />9073 <br />8412 <br />7800 <br /> <br />Most Likely Projection <br />1980 <br />2000 <br />2020 <br /> <br />1897 <br />1994 <br />1808 <br /> <br />9028 <br />8158 <br />7451 <br /> <br />~laximu:a Proj ection <br />1980 <br />2000 <br />'2020 <br /> <br />1905 <br />1872 <br />1775 <br /> <br />8937 <br />7492 <br />6262 <br /> <br />Fra:ae\iork Plan of 1969 <br />1970 <br />1930 <br />2000 <br />2020 <br /> <br />1991 <br />1953 <br />2030 <br />1925 <br /> <br />9230 <br />8487 <br />7465 <br />5864 <br /> <br />NOTE: See Exhibits 3 & 4 for depletion projections associated \iith each stuuy. <br /> <br />Exhibit 5 <br /> <br />I <br />I <br />1,1 <br />