Laserfiche WebLink
<br />r-~ <br /> <br />-" <br />'-"-, <br /> <br />'P'" <br /> <br />PERSONNEL <br /> <br />The initial work on this project was directed by Engineer <br /> <br />F. C. Merriell. He was followed by Associate Engineer A. F. <br /> <br />Johnson and later by Engineer S. A. Kerr. Earlier drafts of the <br /> <br />report were prepared by both Mr. Merriell and ",lr. Johnson. <br /> <br />Field work vms under the supervision of Associate Engineer <br /> <br />F. H. Nichols, Assistant Engineer S. B. Porter, Junior Engineer <br /> <br />E. R. Anesi, and E.,gineer S. A. Kerr. <br /> <br />Geological v~rk was directed by Associate ~~gineer M. ~errirnan. <br /> <br />The lands were classified under the direction of ReclarJation <br /> <br />Economist W. W. Johnston. <br /> <br />Water supply studies were made by Assistant Engineer <br /> <br />Leon F. L~ca, Junior Engineer E. R. Anesi, and Engineer S. A. Kerr. <br /> <br />Preliminary plans and estimates were prepared under the <br /> <br />direction of Senior Engineer K. B. Keener. <br /> <br />This report WaS prepared by Engineer S. A. Kerr. <br /> <br />All the activities were supervised by Hydraulic Engineer <br /> <br />E. B. Debler. <br /> <br />81 <br />