Laserfiche WebLink
<br />Power Operations and Major Maintenance Activities <br /> <br />Upper Basin - Colorado River Storage Project <br /> <br />During water year 1992, work was performed to uprate Unit <br />2 at Flaming Gorge and Unit 1 at Morrow Point. Unit 2 at <br />Morrow Point is scheduled for uprating during water year <br />1993. Seal rings on Unit 3 at Glen Canyon were replaced in <br />water year 1992. Seal rings on Unit 4 at Glen Canyon are <br />scheduled to be replaced in water year 1993. <br /> <br />The following table summarizes CRSP power generation for <br />fiscal year 1991. A breakdown by percent of power sources, <br />disposition, and revenues for fiscal year 1991 is shown on the <br />opposite page. Summaries for CRSP generation, purchases, <br />disposition, and revenues from power operations for fiscal <br />year 1992 have not yet been tabulated. <br /> <br />CRSP Power Generation <br /> <br />25 <br />